NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 34/114 LIBERTY STREET 1001041, 52/7502
Document / 8 pages

Air sample results and clearance letter, Warren & Ward, July

Machine-extracted title · confidence 50%

A letter confirming final air sampling results met clearance criteria for 114 Liberty Street after roofing work.

NYC-WTC_000100831–000100838

Folder label: “114 LIBERTY STREET 1001041, 52/7502”

Page image
Scanned page image, NYC-WTC_000100835
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

r

TOTAL FEET: 42425 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0930M.NO2 FEE EXEMPT: Yes ONLY TYPEWRITTEN ----. —_---- APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE Variance OF START OF THE WORK (ABATEMENT ACTIVITIES)

START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02

1. FACILITY ADDRESS: 114 LIBERTY ST. / 119 CEDAR ST. BORO: MANHATTAN ZIP: 10006 TYPE OFFACILITY: BLOCK: 52 LOT: 7502

II. BUILDING OWNER NAME: BUILDING OWNER/ MANAGER Contact -------- ------- TEL. #: ADDRESS: N/A CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error -.-- TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION # : _ _ _ _ _ P11 ADDRESS:'. 14.20 129TH STREET . CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE S DAY E EVENING a NIGHT C WEEKENDS V WEEKDAYS

INSPECTOR NAME: C_ t L L wTi: %k '_ I SQUAD #: BADGE #: fS' DATE OF INSPECTION: C / Z l / o ti TIME OF INSPECTION: From: ~J AM PM f To: ________ AM PM Contact at site: Ar W OLKOtI C.'2 .+3. $t-q~- Inspection disclosed that the following sections were complied with: (Check all that apply) 1-51 -Notifications, Reports, Pla -71 • Air Sampling and Monitorin -1-'r4I • Worker Protection

1.101 • Materials and Equipment 1 116 -Work Place Preparation [_ T:117 .Worker Decontamination System 1.118. Waste Decontamination System rJ 1.126 • Engineering Controls 27 - Entry/Exit Procedures 1.129 - Maintenance of Barriers U 1.138- Encapsulation 1.139 • Enclosure 1.140 • Glovebag 1.141 - Tent i.l37 - ACM Disturbance, RemoveL, Handling 1-146 - Preliminary Clean-up C! 1-147. Final Clean-up Project not started . Inspection revealed all ACM to be intact. New start date: / / Project ongoing, expected completion date: L / 2 /u Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat

Follow up necessary on / / Samples taken: No [_ Yes 1 2 3 4 5 6 Photos taken: Yes No L_ ' Additional comments: 'k Mel G--

Qr 1,..L w.R a►ti.- — . Ilk u. CM'.-t... `M J$—', ~-~C -..cam ,,w,l.l.d,. .J!,I~/~A Q— I.. LA... jZk , %. i ' J.J . 1 ' 1v W.A \•'i-' • w C er+i•-a ~- ( -iCv.,... ..L .,.x &a_____ _ v i

r-- - -RESULTCODE BORO 1 = MANHATTAN 2 ='BRONX 3 = BR000KLYN 4 = QUEENS 5 = STATEN ISLAND I RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS — --- SUPE SOR INITIA ~~ 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) I _-

NYC-WTC 000100835

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100835Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →