NYC 9/11 Public Portal Document
February 19, 2003
TO: Greg Brooks
Deputy Comptroller
Department of Policy, Audit, ontracts a d Accountancy
Environmental
Protection FROM: Christopher 0. Wa
59-17 Junction Boulevard
Flushing, New York RE: Interior cleaning - 114 Liberty Street
11373-5108
Pursuant to our recent conversation, I am writing to
Christopher O. Ward provide some background information regarding DEP'S
Commissioner proposed cleaning of the interior of 114 Liberty
street, Manhattan.
114 Liberty Street is directly across Liberty Street
from the site of the former world Trade Center. It is a
12-story residential building. Each floor is a separate
condominium apartment except for the third floor, which
is occupied by one apartment and two commercial spaces,
and the eleventh and twelfth floors, which constitute a
single duplex apartment.
when the WTC towers collapsed, 114 Liberty suffered
severe external damage from falling structural steel
which pierced the roof and north facade. The building's
occupants abandoned - their apartments, and the building
was used by the Fire Department and other agencies as a
lookout post during the cleanup at Ground Zero. Control
of the building was only relinquished back to the
occupants in the summer of 2002.
After the Ground zero operations ended, the building
required significant work to repair the damage to the
roof and facade. After this was completed, the building
hired a contractor to clean WTC-related debris from the
facades, and the roof was cleaned as part of DEP'S
exterior cleaning program. A contractor was then
retained by the condo board to replace all of the
building's windows.
since early 2002, DEP has been in contact with the
condominium board and unit owners at 114 Liberty. They
have been anxious to have the' building cleaned and are
ready to sign agreements affording the necessary
access. FEMA, which will be funding the project, has
_z also expressed its eagerness to have this work go
forward. This work could not even be considered until
,vO GITY DEP4gr, • the building was secured and sealed (repairs to roof
"'o and facade; replacement of windows). The last of these
Dip .
' tasks, the window replacement, is scheduled to be
completed within the next few days.