NYC 9/11 Public Portal Document
Sent to D. Stanke attentioi
iH
April 24,2003
Board of Directors
114 Liberty Condominium
114 Liberty Street
New York, New York 10006
Dear Board of Directors:
This is to confirm, the Department of Environmental Protection has
completed the clean-up activities as per the clean up and monitoring
specifications and access agreements for 114 Liberty Street.
Attached please find a copy of the correspondence dated April 18,
2003 received from die United States Environmental Protection
Agency regarding the clearance levels at 114 Liberty Street. The
enclosure, which summarizes the analytical results, is also attached.
The review of the clearance results indicated all primary clearance
levels were achieved.
As you are aware from previous correspondences and conversations
with Asbestos Control Program staff, the clean up activities were
developed for the removal of debris from the collapse of the World
Trade Center. The scope of work did not include the removal or
remediation of pre-existing building materials.
Staff has identified various locations where suspect asbestos
containing materials (ACM) were present. These materials include
thermal system insulation, surfacing material, and vinyl asbestos
tiles. The Department did not perform a complete survey or hazard
assessment for asbestos. Limited bulk sampling was performed at
the first floor commercial space upon the identification of severely
damaged material. A copy of the sample results is attached for your
records. The area was cleaned and isolated fforn the remainder of
the building. Clearance sampling was not performed in this area.