Draft clearance letter for 114 Liberty Street, April 2003

Machine-extracted title · confidence 95%

Draft document for a clearance letter regarding surfacing material results and EPA correspondence for 114 Liberty Street.

NYC-WTC_000163147–000163149

Folder label: “E-mails 2003 M. Gilsenan

Page image
Scanned page image, NYC-WTC_000163148
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

April 22, 2003

114 Liberty Condominium 114 Liberty Street New York, New York 10006

Dear 114 Liberty Condominium:

This is to confirm, the Department of Environmental Protection has completed the clean-up activities as per the clean up and monitoring specifications and access agreements for 114 Liberty Street.

Attached please find a copy of the correspondence dated April 18, 2003 received from the United States Environmental Protection Agency regarding the clearance levels at 114 Liberty Street. The enclosure, which summarizes the analytical results, is also attached. The review of the clearance results indicated all primary clearance levels were achieved.

As you are aware from previous correspondences and conversations with Asbestos Control Program staff, the clean up activities were developed for the removal of debris from the collapse of the World Trade Center. The scope of work did not include the removal or remediation of pre-existing building materials.

Staff has identified various locations where suspect asbestos-containing materials (ACM) were present. These materials include thermal system insulation, surfacing material, and vinyl asbestos tiles. The Department did not perform a complete survey or hazard assessment for asbestos. Limited bulk sampling was performed at the first floor commercial space upon the identification of severely damaged material. A copy of the sample results is attached for your records. The area was cleaned and isolated from the remainder of the building. Clearance sampling was not performed in this area

Title 15, Chapter 1 of the Rules of the City of New York requires building owners to determine the absence or presence and amount of ACM that may be disturbed during the course of alteration, renovation, modification, demolition, etc. Further, the rules require notification to the Department prior to the start of asbestos abatement activities. A copy of the rules is posted on the Department’s web site, www.nvc.gov/dep for your reference.

NYC-WTC_000163148

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163148Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000102710 · Box DEP Box 35

Header page of a DEP Asbestos Inspection Report submitted by ETS Construction for the 114 Liberty Street site.

Cited alongside this record in an Ask answer

NYC-WTC_000160522 · Box DEP Box 42

Memo confirming completion of clean-up activities at 114 Liberty Street and reporting achieved clearance levels.

Cited alongside this record in an Ask answer

Compare copies and versions →