NYC 9/11 Public Portal Document
ASBESTOS INSPECTION REPORT
PREMISE NO. E IN 7N DATE
f
b c ~~ 1 D 2
FIAOR ZIP BORO CODE BLOCK LOT SOUAD I BADGE.
INSPECTOR BLDG TYPE BASIS OF INSPECT. ,Yy PHOTOS TAKEN YES' NO
• o c n is
SAMPLE NO. ~+C•
CONTRACTORS NAME
CITYt) SAMPLE NO.
ADDRESS) L
STATE
4v
ZIP
1 PHONE SAMPLE NO.
LABORATORY HAM OWNERS NAME
act O,I CITYj ADDRESS CITY
ADDRESS
5S w
t lit
Zip PHONE STATE ZIP PHONE
STATE.``
r __ TIME OF INSPECTION FROM: ~•--Knopm TO: pm
CONTACT PERSON: r1 C
Inspection disclosed that the following Requirements, Specifications, 1
and Procedures were complied with
e Section 1-51 Notifications, Reports, Plans, and Fees
.2- .Section 1-71 Air Sampling, Monitoring, and Analysis
er ction 1-91 Worker Protection
,g'Section 1-101 Materials and Equipment
Z' Section 1-116 Work Place Preparation
-,0'8ection 1-117 Worker Decontamination Enclosure System
.Q. Section 1-118 Waste Decontamination Enclos re System
Section 1-126 Engineering Controls Section 1.127 Entry/Exit
❑ Section 1-128 Equipment, Waste Decontamination & Removal
Section 1-129 Maintenance of Decontamination System A Barriers
Section 1.137 ACM Disturbance, Handling, & Removal
❑ Section 1-138 Encapsulation 0 Section 1-139 Enclosure
❑ Section 1-140 Glovebag 0 Section 1-141 Tent
❑ Section 1-146 Preliminary Clean Up
❑ Section 1-147 Final Clean Up
❑ Project ongoing, expected completion date_I I
❑ Project completed on or about__ J_ I All surfaces, including abated surfaces are
free of visible ACM debris and Encapsulated
❑ No Access Premise 0 Locked, No response to bell or knocks 0 Abandoned
❑ Inspection based on complaint, no ACM being disturbed or present
❑ Variance Inspection,Approved/Disapproved. Section (a)
❑ Follow Up Necessary ..
Contact person at the site . . ..... . . . . . ............. ......... ..... ........ . .......... . .... .
Additional Continents
L G
NOV I INFRACTIONS RESULT CODE
I i i I I
NOVI I I SUPE VISORS INITIALS
BORO 1 . MANHATTAN 2 • BRONX 3 • BROOKLYN 4 . QUEENS 5 .RICHMOND
BLDG TYPE A > 6 Stones B <6 Storks C Single Family
D School E Hospital F Public Owned Property
RESULT CODES I • Violation Issued 2 - No Violations Issued 3 - No Access
• - Protect not Started (No NOVI 5 • Project Completed No NOVI ACP 30/92
NYC-WTC 000126911
OCR can misread numbers and units. Confirm readings against the page image before using them.