NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/51 MURRAY ST 1001438, 133/10
Document / 2 pages

51 MURRAY ST 1001438, 133/10

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000100316–000100317
Page image
Scanned page image, NYC-WTC_000100316
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 4420 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT L._TRU0921M 2_ ONLY TYPEWRITTEN FEE EXEMPT: Yes APPLICATIONS WILL BE r----- ---------------S— NOTE: ASBESTOS -- -- - INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE OF START OF THE WORK (ABATEMENT ACTIVITIES) C. Variance START DATE: 6/21/02 PROJ. COMPLETION DATE: 7/25/02 I. FACILITY ADDRESS: 51 MURRAY ST. BORO: MANHATTAN ZIP: 10007 TYPE OFFACILITY: BLOCK: LOT: 11. BUILDING OWNER NAME: 51 UNITED CORP. Contact IPAMELA LEE ------- TEL. #: ADDRESS: 51 MURRAY ST. CITY: NY STATE: NY ZIP: 10007 IV. ASBESTOS ABATEMENT CONTRACTOR NAME: FIBER CONTROL INC. TEL. #: (516) 781.3000 FEDERAL EMPLOYER IDENTIFICATION #: P11 ADDRESS: 3010 BURNS AVE CITY: WANTAGH STATE: NY ZIP: 11793 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: SCIENTIFIC LABORATORIES INC • NEW YORK CI NYS ELAP #: 11480 ASBESTOS WORK S HEDULE N D N EVENING ! !! NIGHT ^ L WEEKENDS 0 WEEKDAYS INSPECTOR NAME: M _ __ SQUAD #: { BADGE #: ir't'o t a DATE OF INSPECTION: ~~ /2~ TI OF INSPECTION: From: _J% t~ AM PM e o — TO ❑ PM 'k Contact at site: PAMELA LEE

Inspection disclosed that the following sections were complied with: (Check all that apply) 1.51 - Notifications, Reports, Pla 1-71 - Air Sampling and Monitorin 1.91 - Worker Protection --~! 1.101 - Materials and Equipment [ 1 1-116 • Work Place Preparation C~ J 1.117 -Worker Decontamination System, 1.118. Waste Decontamination System 1.126. EngIneering Controls 1.127 • Entry/Exit Procedures 1-129 • Maintenance of Barriers 1.138 - Encapsulation 1.139 - Enclosure _ I U 1-140 _Glovebag C 1.141 • Tent C' j 1.137 _ACM Disturbance, RemoveL, Handling 1.146. Preliminary Clean-up 1.147 - Final Clean-up Project not started Inspection revealed all ACM to be intact. New start date: / / Project ongoing, expected completion_ date: / / Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat —— Follow up necessary on / — = Samples taken No L_ 1 Yes 1 2

4 5 6 Photos taken: U Yes _ No Additional comments: ~q t~ n O _ n .~

BORO I = MANHATTAN 2 = BRONX 3= BROOOKLYN 4= QUEENS 5= STATEN ISLAND RESULT CODE

RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS su sora iNiriius 4= PROJECT NOT STARTED (NO NOV) 5= PROJECT COMPLETED (NO NOV)

NYC-WTC 000100316

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100316Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →