TOTAL FEET: 15510 0
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection:
ASBESTOS INSPECTION REPORT _ TRUOS07MN02
0NLY7YPFWRr1M FEE EXEMPT: Yes
APPUCA77ONS HSLL RE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ❑Variance
OF START OF THE WORK (ABATEMENT ACTMnES)
START DATE: 6/7/02 PROJ. COMPLETION DATE: 7/7/02
I. FACILITY
ADDRESS: 49 BROADWAY BORO: MANHATTAN ZIP: 10006
TYPE OFFACILITY: BLOCK: LOT:
It. BUILDING OWNER
NAME: . STAHL MIDTOWN PROPERTY Contact JMICHAEL
TEL. #:
ADDRESS: N/A CITY: STATE: ZIP:
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION #: PI j
ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: TIN ZIP: 11356
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE EI DAY ❑ EVENING ❑ NIGHT ❑ WEEKENDS 0 WEEKDAYS
INSPECTOR NAME: CARL- L.4C►.t v.A "t , tt. SQUAD #: 1 BADGE #: 4o is
DATE OF INSPECTION: G / /0'L TIME OF INSPECTION: From: _ AM —PM
To: 14. AM I PM [I?~
Contact at site: M11:J"Et Jta 1 L'OI~Cy'1C7. gYL~1q
Inspection disclosed that the following sections were co 9edwith: (Check all that apply)
0 1.51 • Notifications, Reports, Pla [ i.71. Air Sampling and Monitorin 1.91 - Worker Protection
A! 1.101 •Materials and Equipment 1.116. Work Place Rreparation 1117 • Worker Decontamination System
1.118 • Waste Decontamination System fl 1 1.126. Enelneerina Controls E1 1.197 . Fnfn,/Fi+ Pr I,,..
1.129 • Maintenance of Barriers L 1.138. Encapsulation 1.139. Enclosure
1.140 Glovebag 1.141 . Tent O 1.137 • ACM Disturbance, RemoveL Handling
[]
L_j 1.146. Preliminary Cleanup 1.147 . Final Cleanup
Vj^' Project not started
Inspection
revealed all ACM to be intact. New start date: / /
(Project ongoing, expected completion date: G / 1 L}• / 0t
Li Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and erI apsult
Follow up necessary on / /
Samples taken: `y -- No E] Yes 1 •2 3
4 5 6 Photos taken: fl Yes No
Additional comments:'" „. • S r v 'e aM
~1- St}e- g~ ~tL. Lw-:
Lew 4e u~t S o~~aM c~h+~_ _
e `
Ft 4~Ql tsati+ it►~~~ .v,. !. — C~PN~,,x ad OS%$D.. S LY
5+4 Yt 0. V LAe*.,..~o tr atn wr ,
a
W QAAfM. } oM, 6 1
y a.T ,' I -.
r --"'
BORO 1= MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEENS ~7coDE—?
5 = STATEN ISLAND r
RESULT CODES 1= VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS
ws
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000118073
OCR can misread numbers and units. Confirm readings against the page image before using them.