NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/67 GREENWICH STREET 1000796, 19/11
Document / 23 pages

Asbestos removal invoice, 67 Greenwich Street, June 2002

Machine-extracted title · confidence 90%

Invoice from Asbestos Removal Corp detailing costs for roof cleanup at 67 Greenwich Street dated June 13, 2002.

NYC-WTC_000128261–000128283

Folder label: “67 GREENWICH STREET 1000796, 19/11

Page image
Scanned page image, NYC-WTC_000128277
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

lye , R,r - *Llk s96tr .~R x; x ,Lti ; bn 1 j 5p

TOTAL FEET: 10815 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRU0861MN02 FEE EXEMPT: Yes ONLYTYPEWRITTEN . . __._..--_---------~_--- .-----__-----.--..-- APPLJCATIONS WILL BE [NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED I 1. $0.00 ACCEPTED l̀ ----- -- TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE fl Variance OF START OF THE WORK (ABATEMENT ACTIVITIES) START DATE: 6/14/02 PROJ. COMPLETION DATE: 6/17/02

1. FACILITY ADDRESS: 67 GREENWICH STREET/28 TRINITY PL BORO: MANHATTAN ZIP: 10006 TYPE OFFACILITY: BLOCK: 19 LOT: 11

II. BUILDING OWNER NAME: 67 GREENWICH LLC C/O MARTHA SCHESSEL Contact L I' TEL. #: ADDRESS: 67 CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORPORATION TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION # : ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: IN ZIP: 11356 V1. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE Li DAY =1 EVENING [II NIGHT 11 WEEKENDS [JWEEKDAYS

INSPECTOR NAME: CN` 4tArQ~ {.i<w► yeti SQUAD #: BADGE #: DATE OF INSPECTION: tD / 16 /0 1 TIME OF INSPECTION: From: (, AM PM i_ ,y To: , 2 AM I - 1 PM Contact at site: a 1 IV `A O — fAnrw~:

Inspec ' disclosed that the following sections were complied with: (Check all that apply) 1-51 - Notifications, Reports, Pla 1.71 • Air Sampling and Monitorin /1.91 - Worker Protection 1.101 - Materials and Equipment 1.116 - Work Place Preparation 1.117 -Worker Decontamination System 1-118. Waste Decontamination System 1-126 - Engineering Controls ,.'"1.127 - Entry/Exit Procedures • 1-129. Maintenance of Barriers 1.138. Encapsulation ! I 1.139 Enclosure 1.140 - Glovebag 1-141 - Tent 1-137 - ACM Disturbance, RemoveL, Handling 1.146 - Preliminary Clean-up L - j 1.147. Final Clean-up Project not started . Inspection revealed all ACM to be intact. New start date: / / Project ongoing, expected completion date: / / Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat Follow up necessary on / / Samplestaken [ No Yes 1 2 3 4 5 6 Photos taken: Yes No Additional comments: Y~O _k._ . -.j Wb

BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS ! RESULT CODE 5 = STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPS INITIALS y 4= PROJECT NOT STARTED (NO NOV) 5= PROJECT COMPLETED (NO NOV)

NYC-WTC 000128277

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128277Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →