NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 52/67 GREENWICH STREET 1000796, 19/11
Document / 7 pages

WTC property inspection form, 67 Greenwich Street

Machine-extracted title · confidence 90%

Form recording property details and facade inspection results for 67 Greenwich Street under the WTC environmental file series.

NYC-WTC_000128304–000128310

Folder label: “67 GREENWICH STREET 1000796, 19/11”

Page image
Scanned page image, NYC-WTC_000128307
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 10815 0~ NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT 1M 2-_j ONLYTYPEWRIfTEN FEE EXEMPT: Yes APPLICATIONS IMLL BE 1NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMATI ED 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE OF START OF THE WORK (ABATEMENT ACTIVITIES) D Variance START DATE: 6/14/02 PROJ. COMPLETION DATE: 6/17/02 1. FACILITY ADDRESS: 67 GREENWICH STREET/28 TRINITY PL BORO: MANHATTAN ZIP: 10006 TYPE OFFACILITY: BLOCK: 19 LOT: 11 U. BUILDING OWNER NAME: 67 GREENWICH LLC C/O MARTHA SCHESSEL Contact J TEL #: ADDRESS: 67 CITY: STATE. ZIP: IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORPORATION TEL #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION # : ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS FLAP #: 11251 ASBESTOS WORK SCHEDULE ❑ DAY 0 EVENING ❑ NIGHT C WEEKENDS 0 WEEKDAYS INSPECTOR NAME: A -L'ftfeM C*"e'e. SQUAD #: 1 BADGE #: DATE OF INSPECTION: ,/~ If, /p 2 TIME OF INSPECTION: From: _ } 2. • o • AM ~PM

Contact at site: S L E t w O 1. Pr ~} ? s 3 J To: S• E AM PM

Inspection disclosed that the following sections were complied with: (Check all that apply) 1.51 • Notifications, Reports, Pia Cj 1.71 - Air Sampling and Monitorin [_.J 1.91 • Worker Protection 1-101 _Materials and Equipment 1-116- Work Place Preparation 1-117 -Worker Decontamination System 1-118. Waste Decontamination System 1.126 - Engineering Controls 1-127 - Entry/Exit Procedures fl 1.129 - Maintenance of Barriers f ] 1.138. Encapsulation 1.139. Enclosure 1.140 • Giovebag fl 1.141 • Tent a 1.137. ACM Disturbance, RemoveL, Handling I.146 - Preliminary Clean-up 1.147 - Final Cleanup Project not started _ _ . Inspection revealed all ACM to be intact. New start date: / / - 1 Project ongoing, expected completion date: _ / / L~ Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat r Follow up necessary on / / Samples taken: n No Yes 1 2 3 [] 4 5 6 Photos taken: Yes No Additional comments: y, ,. ck•- a, `~ k . t, a,, ~ ~1 ~ I 6

BORO 1= MANHATTAN 2 = BRONX 3= BR000KLYN 4 = QUEENS WESULT CODE 5 = STATEN ISLAND RESULT CODES 1= VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR i 4= PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) L __

NYC-WTC 000128307

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128307Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →