NYC 9/11 Public Portal Document
TOTAL FEET: 10815 0
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection:
ASBESTOS INSPECTION REPORT TRU0861_M_NO2
ONLY TYPEWRATEN FEE EXEMPT: Yes
APPUCAT10NS W LL BE NOTE ASBESTOS INSPECTION REPORT SHALL BE suBMrrii1 1. 80.00
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ❑Variance
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 6/14/02 PROJ. COMPLETION DATE: 6/17/02
I. FACILITY
ADDRESS: 67 GREENWICH STREET/28 TRINITY PL BORO: MANHATTAN ZIP: 10006
TYPE OFFACIUTY: BLOCK: 19 LOT: 11
Ii. BUILDING OWNER
NAME: 67 GREENWICH LLC C/O MARTHA SCHESSEL Contact I
TEL. N:
ADDRESS: 67 CITY: STATE: ZIP:
N. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION - -.-.-.-.- -.-.-.- -
TEL. #: (718)961.4100 FEDERAL EMPLOYER IDENTIFICATION # : '----------------P!1
ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE ❑ DAY ❑ EVENING ❑ NIGHT • ❑ WEEKENDS ❑ WEEKDAYS
INSPECTOR NAME: ASR, l.. 1 C &w.,thR{,. SQUAD #: _ BADGE #:
DATE OF INSPECTION: b / (ti / 0 '' TIME OF INSPECTION: From: AM PM E
TI To: AM PM
Contact at site: ? 0 Q 3S 3 \
Inspection disclosed that the following sections were complied with: (Check all that apply)
1.51 - Notifications, Reports, Pia 1.71- Air Sampling and Monitorin .O 1.91 - Worker Protection
1.101 - Materials and Equipment [ j 1.116 - Work Place Preparation 1.117 - Worker Decontamination System
—~
1.118_ Waste Decontamination System C 1.126. Engineering Controls [ ] 1.127 .Entry/Exit Procedures
1.129 - Maintenance of Barriers a 1.138 - Encapsulation a 1.139. Enclosure
1.140 - Glovebag 1.141 - Tent a 1.137 • ACM Disturbance, Removel., Handling
L_i 1.146. Preliminary Clean-up 1.147 - Final Cleanup
Project not started . Inspection
revealed all ACM to be intact. New start date: / /
Project ongoing, expected completion date: / /
[_j Project completed on or about / / . All surfaces, Including abated surfaces are free of visible ACM and encapsulat
= r~
i Follow up necessary on _ / /
Samples taken: u No L__1 Yes 1 2 3 - v-
4 5 6 Photos taken: Yes u; No
Lj
_—i
Additional com ts: , `~ n /
ku .~.a s M
to o E k., w el~u•
w'c kL, v. ~o,,. set s.Jl Iv
cb,.. .~ar..a•x
b— w wL-k M. w..L1,
_1 •bwt ~.M t tl
-_ill
BORO I = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1= VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000128308