NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 47/49 BROADWAY 1000806, 20/13
Document / 7 pages

License agreement for debris removal, 49 Broadway, 2002

Machine-extracted title · confidence 50%

Legal agreement between the City of New York and property owners authorizing cleanup of foreign material from exterior areas.

NYC-WTC_000118073–000118079

Folder label: “49 BROADWAY 1000806, 20/13”

Page image
Scanned page image, NYC-WTC_000118074
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 15510 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection ASBESTOS INSPECTION REPORT I TRU0807MN0- OULY rvpEV VMN FEE EXEMPT: Yes APPUGT10NS WILL BE 'NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ❑Variance OF START OF THE WORK (ABATEMENT ACTIVI TIES) START DATE: 6/7/02 PROJ. COMPLETION DATE: 7/7/02 L FACILITY ADDRESS: 49 BROADWAY BORO: MANHATTAN ZIP: 10006 TYPE OFFACIUTY: BLOCK: LOT: IL BUILDING OWNER NAME: STAHL MIDTOWN PROPERTY Contact IMICRAEL TEL. W ADDRESS: N/A CITY: STATE: ZIP: IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORPORATION TEL #: (718)961-4100 FEDERAL EMPLOYER IDENTIFICATION U: L PI1 ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VL LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE ❑ DAY 0 EVENING ❑ NIGHT 0 WEEKENDS 0 WEEKDAYS INSPECTOR NAME: l w-rc K M t'9ItL„ SQUAD #: I _ BADGE #: f a // DATE OF INSPECTION: b /' /o 2. TIME OF INSPECTION: From: 2 AM Yj ', PM i To: AM PM Contact at site: Mt6i EL J A$ wefts ovwtt S y ~~y ~ ,

Inspection disclosed that the following sections were complied with: (Check all that apply) 1.51 - Notifications, Reports, Pla t - Air Sampling and Monitorin - Worker Protection 1.101 • Materials and Equipment - -~ 1.116 -Work Place PFeparation L 1.117 -Worker Decontamination System { 1.118 • Waste Decontamination System C 1.126 - Engineering Controls fl 1.127 - Entry/Exit Procedures 1.129 - t Mainenance of Barriers 1-138 • EncaPsulation 1-139 -Enclosure [i]] 1.140. Glovebag 1.141 - Tent 1.137 - ACM Disturbance, RemoveL, Handling j 1.146 - Preliminary Cleanup a 1.147 - Final Cleanup LIT Project not started - Insaeetion waiw mU ewm zv oe intact. New start Date: / / Project ongoing, expected completion date: / / [j ]Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat Follow up necessary on / / Samples taken: = No O Yes 1 2 3 4 5 6 Photos taken: Yes No Additional comments: o d~ Wr .n.~o %%%' Al1.~-4 w. w 4n\ Ov♦. rei. ~a ... 4

BORO 1= MANHATTAN 2= BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND RESULT CODES 1= VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

d

NYC-WTC 000118074

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000118074Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →