NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 47/49 BROADWAY 1000806, 20/13
Document / 7 pages

License agreement for debris removal, 49 Broadway, 2002

Machine-extracted title · confidence 50%

Legal agreement between the City of New York and property owners authorizing cleanup of foreign material from exterior areas.

NYC-WTC_000118073–000118079

Folder label: “49 BROADWAY 1000806, 20/13”

Page image
Scanned page image, NYC-WTC_000118075
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 15510 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT : 3 TRU0807MN02 FEE EXEMPT: Yes II711 BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE suBMri 1 1. $0.00 U C4TI TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ❑ Variance OF START OF THE WORK (ABATEMENT ACTIVITIES) START DATE: 6/7/02 PROJ. COMPLETION DATE: 7/7/02 I. FACILITY ADDRESS: 49 BROADWAY BORO: MANHATTAN ZIP: 10006 TYPE OFFACiLITY: BLOCK: LOT., U. BUILDING OWNER NAME: STAHL MIDTOWN PROPERTY Contact JMCRAEL rr ~ TEL #: ADDRESS: N/A CITY: STATE: ZIP: IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORPORATION TEL #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION #: P11 ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME. WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE 0 DAY 0 EVENING ❑ NIGHT 0 WEEKENDS 0 WEEKDAYS INSPECTOR NAME: C"+LL" L -i't &On k1- SQUAD #: % SA E #: _co: : DATE OF INSPECTION: / 6 / 0 2., TIME OF INSPECTION: From: AM PM L •Z To: AM I PM Contact at site: MN#dBYt r, O t. 1—O W 0 4

inspectio Isclosed that the following sections were co plied with: (Check alt that apply) 1.51 - Notifications, Reports, Pla 1.71 • Air Sampling and Monitorin 1 • Worker Protection t—i 1.101 • Materials and Equipment 16 • Work Place Preparation [ '1' 117 • Worker Decontamination System L—i 1.118 • Waste Decontamination System Q 1.126 -Engineering Controls t_ 1.127 • Entry/Exit Procedures 1.129 -Maintenance of Barriers 1.138. Encapsulation 1.139 • Enclosure 1.140 • Glovebag Q 1.141 -Tent 1.137 • ACM Disturbance, RemoveL, Handling 1.146 • Preliminary Clean-up 0 1.147 - Final Clean-up Project not started . Inspection revealed all ACM to be intact New start date: / / Project ongoing, expected completion date: / / Project completed on or about / / . All surfaces, Including abated surfaces are free of visible ACM and enthpsulat' Follow up necessary on / / Samples taken: = 2 3 No O Yes 1 4 5 6 Photos taken: Yes ~~ Additional comments: M t ~ ~ v► ~~ •

B ~.OwI1.eA voA -K ~ b4ywfy '_ V j t i tdjk •N► T.~. e N► o...+~ ~.•l 4~+

RORO 1= MANHATTAN 2 = BRONX 3= BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

I

NYC-WTC 000118075

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000118075Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →