NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 47/49 BROADWAY 1000806, 20/13
Document / 7 pages

License agreement for debris removal, 49 Broadway, 2002

Machine-extracted title · confidence 50%

Legal agreement between the City of New York and property owners authorizing cleanup of foreign material from exterior areas.

NYC-WTC_000118073–000118079

Folder label: “49 BROADWAY 1000806, 20/13

Page image
Scanned page image, NYC-WTC_000118075
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 15510 0 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT : 3 TRU0807MN02 FEE EXEMPT: Yes II711 BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE suBMri 1 1. $0.00 U C4TI TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ❑ Variance OF START OF THE WORK (ABATEMENT ACTIVITIES) START DATE: 6/7/02 PROJ. COMPLETION DATE: 7/7/02 I. FACILITY ADDRESS: 49 BROADWAY BORO: MANHATTAN ZIP: 10006 TYPE OFFACiLITY: BLOCK: LOT., U. BUILDING OWNER NAME: STAHL MIDTOWN PROPERTY Contact JMCRAEL rr ~ TEL #: ADDRESS: N/A CITY: STATE: ZIP: IV. ASBESTOS ABATEMENT CONTRACTOR NAME: TRIO ASBESTOS REMOVAL CORPORATION TEL #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION #: P11 ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME. WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE 0 DAY 0 EVENING ❑ NIGHT 0 WEEKENDS 0 WEEKDAYS INSPECTOR NAME: C"+LL" L -i't &On k1- SQUAD #: % SA E #: _co: : DATE OF INSPECTION: / 6 / 0 2., TIME OF INSPECTION: From: AM PM L •Z To: AM I PM Contact at site: MN#dBYt r, O t. 1—O W 0 4

inspectio Isclosed that the following sections were co plied with: (Check alt that apply) 1.51 - Notifications, Reports, Pla 1.71 • Air Sampling and Monitorin 1 • Worker Protection t—i 1.101 • Materials and Equipment 16 • Work Place Preparation [ '1' 117 • Worker Decontamination System L—i 1.118 • Waste Decontamination System Q 1.126 -Engineering Controls t_ 1.127 • Entry/Exit Procedures 1.129 -Maintenance of Barriers 1.138. Encapsulation 1.139 • Enclosure 1.140 • Glovebag Q 1.141 -Tent 1.137 • ACM Disturbance, RemoveL, Handling 1.146 • Preliminary Clean-up 0 1.147 - Final Clean-up Project not started . Inspection revealed all ACM to be intact New start date: / / Project ongoing, expected completion date: / / Project completed on or about / / . All surfaces, Including abated surfaces are free of visible ACM and enthpsulat' Follow up necessary on / / Samples taken: = 2 3 No O Yes 1 4 5 6 Photos taken: Yes ~~ Additional comments: M t ~ ~ v► ~~ •

B ~.OwI1.eA voA -K ~ b4ywfy '_ V j t i tdjk •N► T.~. e N► o...+~ ~.•l 4~+

RORO 1= MANHATTAN 2 = BRONX 3= BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

I

NYC-WTC 000118075

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000118075Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →