NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 34/114 LIBERTY STREET 1001041, 52/7502
Document / 8 pages

Air sample results and clearance letter, Warren & Ward, July

Machine-extracted title · confidence 50%

A letter confirming final air sampling results met clearance criteria for 114 Liberty Street after roofing work.

NYC-WTC_000100831–000100838

Folder label: “114 LIBERTY STREET 1001041, 52/7502”

Page image
Scanned page image, NYC-WTC_000100837
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 42425 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRUG930MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN _ APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBM 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE Variance OF START OF THE WORK (ABATEMENT ACT)VITIES)_

START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02

1. FACILITY ADDRESS: 114 LIBERTY ST. / 119 CEDAR ST. BORO: MANHATTAN ZIP: 10006

TYPE OFFACILITY: BLOCK: 52 LOT: 7502

II. BUILDING OWNER NAME: BUILDING OWNER/ MANAGER Contact ---- TEL. #: ADDRESS: N/A CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: .(718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION B: l P11 ADDRESS: 14.20 129TH STREET - CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE K DAY EVENING ❑ NIGHT EWEEKENDS 5G WEEKDAYS INSPECTOR NAME: 1.144 Ls.- (G4 • L--91 ,-L SQUAD #: BADGE #:

DATE OF INSPECTION: -G_~ O ~- TIME OF INSPECTION: From: Z' I ) AM PM

~( To: 3 J AM __PM

Contact at site: JH''" L 4 O~V`~WSk\ t3 9'+ q1

Inspection disclosed that the following sections were c 9Ued with: (Check all that apply) ~~f51 _Notifications, Reports, Pla U 1.71_Air Sampling and Monitorin 191 - Worker Protection _ ---~

1-101 - Materials and Equipment 1.116 - Work Place Preparation 4 -1.117 - Worker Decontamination System 1-118 - Waste Decontamination System E - j 1.126 - Engineering Controls ~ r 1.127 - Entry/Exit Procedures -- - 1.129 - Maintenance of Barriers U 1.138 Encapsulation U 1.139 - Enclosure - {I 1-140 - Glovebag 1-141 - Tent j 6? - ACM Disturbance, RemoveL, Handling 1-146 - Preliminary Cleanup 1.147 - Final Clean-up _ Project not started -_--- -------__ --- -----' -- - - _ Inspection - - revealed all ACM to be intact. New start date: Project ongoing, expected completion date: / /

Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat; Follow up necessary on / / Samples taken: ~ i No Ii Yes 1 2 3 4 5 6 _ Photos taken: C Yes j No Additional comments:

l.J OAAAn- I -

RESULT CODE BORO 1 = MANHATTAN 2 =BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS °5 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000100837

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100837Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →