NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/114 LIBERTY STREET 1001041, 52/7502
Document / 8 pages

Air sample results and clearance letter, Warren & Ward, July

Machine-extracted title · confidence 50%

A letter confirming final air sampling results met clearance criteria for 114 Liberty Street after roofing work.

NYC-WTC_000100831–000100838

Folder label: “114 LIBERTY STREET 1001041, 52/7502

Page image
Scanned page image, NYC-WTC_000100837
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 42425 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT TRUG930MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN _ APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBM 1. $0.00 ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE Variance OF START OF THE WORK (ABATEMENT ACT)VITIES)_

START DATE: 6/20/02 PROJ. COMPLETION DATE: 6/30/02

1. FACILITY ADDRESS: 114 LIBERTY ST. / 119 CEDAR ST. BORO: MANHATTAN ZIP: 10006

TYPE OFFACILITY: BLOCK: 52 LOT: 7502

II. BUILDING OWNER NAME: BUILDING OWNER/ MANAGER Contact ---- TEL. #: ADDRESS: N/A CITY: STATE: ZIP:

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error TEL. #: .(718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION B: l P11 ADDRESS: 14.20 129TH STREET - CITY: COLLEGE POINT STATE: ]N ZIP: 11356 VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 ASBESTOS WORK SCHEDULE K DAY EVENING ❑ NIGHT EWEEKENDS 5G WEEKDAYS INSPECTOR NAME: 1.144 Ls.- (G4 • L--91 ,-L SQUAD #: BADGE #:

DATE OF INSPECTION: -G_~ O ~- TIME OF INSPECTION: From: Z' I ) AM PM

~( To: 3 J AM __PM

Contact at site: JH''" L 4 O~V`~WSk\ t3 9'+ q1

Inspection disclosed that the following sections were c 9Ued with: (Check all that apply) ~~f51 _Notifications, Reports, Pla U 1.71_Air Sampling and Monitorin 191 - Worker Protection _ ---~

1-101 - Materials and Equipment 1.116 - Work Place Preparation 4 -1.117 - Worker Decontamination System 1-118 - Waste Decontamination System E - j 1.126 - Engineering Controls ~ r 1.127 - Entry/Exit Procedures -- - 1.129 - Maintenance of Barriers U 1.138 Encapsulation U 1.139 - Enclosure - {I 1-140 - Glovebag 1-141 - Tent j 6? - ACM Disturbance, RemoveL, Handling 1-146 - Preliminary Cleanup 1.147 - Final Clean-up _ Project not started -_--- -------__ --- -----' -- - - _ Inspection - - revealed all ACM to be intact. New start date: Project ongoing, expected completion date: / /

Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat; Follow up necessary on / / Samples taken: ~ i No Ii Yes 1 2 3 4 5 6 _ Photos taken: C Yes j No Additional comments:

l.J OAAAn- I -

RESULT CODE BORO 1 = MANHATTAN 2 =BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS °5 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000100837

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100837Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →