NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/112 LIBERTY 1001042, 52/7501
Document / 18 pages

Invoice for roof cleanup, 110 Liberty Street, July 2002

Machine-extracted title · confidence 95%

Itemized invoice from Asbestos Removal Corp. detailing costs for asphalt and gravel roof cleanup at 110 Liberty Street.

NYC-WTC_000100549–000100566

Folder label: “112 LIBERTY 1001042, 52/7501

Page image
Scanned page image, NYC-WTC_000100550
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document fe 07 7 . / ( — + NYC GEPARTMENT OF ENVIRONMENTAL PROTECTION On Asbestos Control Program | \02, Mua 1 es . 59-17 Junction Boulevard, 8" Floor, Corona, NY 11368-5107 ON. , ie . TOR OFOnL ha Rane: _ ASBESTOS PROJECT NOTIFICATION = a (ASBESTOS INSPECTION REPORT) 1. LY CHE + (Se¢-fee schedule) ; When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities . 1. FACILITY Borough Manhattan Zip _10004 - 2. Address 110 Liberty Street / 113-117 Cedar Street 3. Block 4. Lot 6. Name of Building 5. Type of Facility ll. BUILDING OWNER 7. Name Baldwin Realty, c/o Charles Gangler 8. Contact Person 9. Tel. # (908) 753-6264 Fax # 10. Address City State Zip II. GENERAL CONTRACTOR 11. Name Tel. # Iv. ASBESTOS ABATEMENT CONTRACTOR 12. Name Trio Asbestos Removal Corp. 43. Contact Person Steven Parmigiani 14. Federal Employer !D.# PI | 45, Tel. # (718) 961-4100 ____ Fax # (718) 961-4103 46. Address 14-20 129 Street City College Point State NY Zip 11356 V. THIRD PARTY AIR MONITOR 47. Name Warren & Panzer Engineers, P.C. 48. Contact Person Michael Nolan 19. Federal Employer ID. # 20. Tet. # (212) 922-0077 Fax # (212) 922-0630 21. Address 228 East 45th Street city NY a state NY zip _10017 22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH ELAP # 11251 Vi. PROJECT INFORMATION . 24. Starting date for this portion of work d | Ib | ot Projected completion date male: 9 ol ET sunday Asbestos work schedule AD Monday ANT vesday EX Wednesday thursday DiFriday [Lsaturday << Shift from: g fo am Oo pm to a Olam om If other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. J U L 1 5 . . . OEP, 25. Total amount of asbestos-containing material to be abated during this work “SBE 2 12,678 Square Feet, and/or OO Linear Feet —-r NYC-WTC_000100550 2002 FR:

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100550Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →