NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 25660 0
ASBESTOS INSPECTION REPORT Basis of Inspection: >~ $r
4,5501
TRU1047MN02 I roof 0
ONLYTYPEWRITfEN _ 3,300, ----- roof 0
APPLICATIONS WH.L BE -
NOTE: ASBESTOS INSPECTION --. SHALL BE SUBMITTED
REPORT FEE EXEMPT: Yes roof 900 0
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE 1. $0.00 roof 1,250 0
OF START OF THE WORK (ABATEMENT ACTIVITIES) yar1 4,410 0
aga + 5,625 0
START DATE: 7/8/02 COMPLETION DATE: 7/30/02 a a 5,625 0
I. FACILITY
ADDRESS: 60 PINE STREET BORO: MANHATTAN ZIP: 10005
TYPE OFFACILITY: BLOCK: 41 LOT: 15
II. BUILDING OWNER
NAME: DOWNTOWN ASSOCIATION
TEL. #: (212) 422.1982
ADDRESS: 60 pine street CITY: ny STATE: ny ZIP: 10005
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION -I
TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION N:
ADDRESS: 14.20 129 STREET CITY: COLLEGE POINT STATE: NY ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C.
TEL. #: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE V DAY W EVENING V] NIGHT W WEEKENDS WEEKDAYS
INSPECTOR NAME: R yyto wr SQUAD #: t BADGE #:
DATE OF INSPECTION: 7/ /2 / 0 2- TIME OF INSPECTION: From: g AM I PM j I
To: fYi7 PM
Contact at site: 54 ve. P~,P ~t~ O¢ ,w4.
AM
Inspection disclosed that the following sections were complied with: (Check all that apply)
1-51 • Notifications, Reports, Pla 1 1.71 . Air Sampling and Monitorin r 1.91 • Worker Protection
1.101 - Materials and Equipment I j 1-116 • Work Place Preparation 1.117 - Worker Decontamination System
1.118 - Waste Decontamination System I 1 1.126 - Engineering Controls I 1.127 - Entry/Exit Procedures
~ 1.129- Maintenance of Barriers 1.138 - Encapsulation 1.1 - Enclosure
i I 1.140 - Glovebag I 1.141 Tent 1-137 - ACM Disturbance, RemoveL, Handling
1.146 - Preliminary Clean-up 1 1 1-147- Final Clean-up
Project not started Inspection
revealed all ACM to be Intact. New start date: / /
)<'J Project ongoing, completion
/ date: /
Project completed oora bout All surfaces, including abated surfaces are free of visible ACM and encapsulat
Follow up necessary on / /
Samples taken: &.,' No L I Yes 1 2 3
4 5 6 Photos taken: I- .I Yes No
Additional comments: '
(/1Polinc w c3 e j.sd
~: felh0 wc4-Ye•
cfea . c~rr e .
RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3= BR000KLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERVISOR INITIALS
4 = PROJECT NOT STARTED (NO NOV) 5= PROJECT COMPLETED (NO NOV) "^ 1
NYC-WTC 000114926