28. Methods of ACM Abatement (Check all appropriate boxes)
Full Containment Repair Enclose L-' Clean up
Glovebag Encapsulation Li Tent
Other, Specify:
29. This asbestos abatement is part of a
Demolition Boiler Replacement Sprinkler Replacement
Renovation/Alteration _ Fire proofing Replacement
Other, (Describe):
FL AREA METHOD SF I LF
ROOFS ITEM NO.3 11565 0
WALLS ITEM NO.8 3635 0
AIR SHAFT 0' 0
ROOF ITEM NO. 3 J 1500 0
WALLS ITEM NO. 8 24105 0
NYC-WTC 000107874
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000107874Source: NYC Law Department, mirrored locally