NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 8 pages

Asbestos inspection report header, unknown date

Machine-extracted title · confidence 90%

Fragmented header page of an asbestos inspection report for the WTC site, indicating fee exemption and variance status.

NYC-WTC_000107873–000107880

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107873
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

m ..

V) ' V .r r ._. . ..-e'r.nH. .. ajr

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION REPORT I TRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN TED 1. $0.00 APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMIT ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE ( ; Variance OF START OF THE WORK (ABATEMENT ACT1VITIES)

6/20/02 PROD. COMPLETION DATE: 6/30/02 START DATE:

1. FACILITY BORO: MANHATTAN ZIP: 10006 ADDRESS: 120 LIBERTY ST./ 125 CEDAR ST. BLOCK: 52 LOT: 21 TYPE OFFACILITY:

Ii. BUILDING OWNER —mss -- NAME: 120 LIBERTY STREET, LLC Contact TEL. #: CITY: STATE: ZIP: - ADDRESS: N/A

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error --- --; FEDERAL EMPLOYER IDENTIFICATION #: L---------- TEL. #: (718) 961.4100 CITY: COLLEGE POINT STATE: NY ZIP: 11356 ADDRESS: 14.20 129 STREET NAME: WKP LABORATORIES C/O WARREN & PANZER E VI. LABORATORY FOR SAMPLE ANALYSIS NYS ELAP #: 11251

V DAY IV EVENING eC NIGHT K WEEKENDS I✓ WEEKDAYS ASBESTOS WORK SCHEDULE

INSPECTOR NAME: CA4 .- SQUAD #: 1 BADGE #: S

/ 0 2 TIME OF INSPECTION: From: dT AM - PM DATE OF INSPECTION: To: b AM PM J'`'-+- t'A - . I IN - Contact at site: Dom! Q~w` ti v. 1

Inspection disclosed that the following sections were complied with: (Check all that apply) -

1-51 - Notifications, Reports, Pla ..r<1-71 - Air Sampling and Monitonn 91 - Worker Protection

1.101 - Materials and Equipment 1.116 - Work Place Preparation 1.117 - Worker Decontamination System

1-126 - Engineering Controls r~ 1.127 - Entry/Exit Procedures 1-118 - Waste Decontamination System _ 1-129 Maintenance of Barriers 1-138 - Encapsulation 1.139 Enclosure t F 1 1-141 - Tent 1.137 - ACM Disturbance, RemoveL. Handling 1.140 - Glovebag

1-146 - Preliminary Clean-up 1-147 - Final Clean-up

Project not started Inspection

revealed all ACM to be intact. New start date: Project ongoing, expected completion date:

Project completed on or about / / All surfaces, including abated surfaces are free of visible ACM and encapsulat''

Follow up necessary on

Samples taken: , No Yes 1 2 3

5 6 Photos taken: Yes No 4

Additional comments: G 1 1 , Lf L,btL~' 1(1' tlpla % • dM Ct S _1

~'L•A JI~ Y+ ~• - I\ t{' -- LL :it ._ ~j ;- ' Cam. • -- Z - Y

RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND

RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS L SUPER ZR

4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)

NYC-WTC 000107873

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107873Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →