NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 4 pages

Asbestos inspection report, 120 Liberty/125 Cedar, June 2002

Machine-extracted title · confidence 85%

NYC DEP asbestos inspection report covering approximately 40,805 linear feet with project dates June 20-30, 2002.

NYC-WTC_000107857–000107860

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107860
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Page ---of — ASBESTOS INSPECTION REPORT (con't)

r

28. Methods of ACM Abatement (Check all appropriate boxes) J Enclose E Clean up Full Containment Repair

Glovebag r Encapsulation ❑ Tent

Other, Specify:

29. This asbestos abatement is part of a Demolition Boiler Replacement ❑ Sprinkler Replacement

L Renovation/Alteration U Fire proofing Replacement

Other, (Describe): fL . , _ : --.METH SF ¶:..Lf ROOFS :ITEM NO.3 11565 0 I -' --- ALLS _3635. 0 AIR SHAFT ROOF--- ITEM ALLS IITEMNQ.8 3 f 1500 24105 0 0

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107860Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →