NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/120 Liberty St / 125 Cedar St - MMU -
Document / 4 pages

Asbestos inspection report, 120 Liberty/125 Cedar, June 2002

Machine-extracted title · confidence 85%

NYC DEP asbestos inspection report covering approximately 40,805 linear feet with project dates June 20-30, 2002.

NYC-WTC_000107857–000107860

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107859
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENT L PROTECTION Basis of Inspection: ASBESTOS INSPECTION RE SORT LiUO 929MNO2 FEE EXEMPT: Yes DINLY TYPEWRITTEN 1. $0.00 APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL B SUBMITTED ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK 1 ADVANCE El Variance OF START OF THE WORK (ABATEMENT A VITIES)

6/20/02 PROJ. COMPL TION DATE: 6/30/02 START DATE:

I. FACILITY 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHA AN ZIP: 10006 ADDRESS: BLOCK: 52 LOT: 21 TYPE OFFACILITY:

II. BUILDING OWNER r NAME: 120 LIBERTY STREET, LLC Contacit II l — TEL. #: CITY: STATE: ZIP: ADDRESS: N/A

IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error FEDERAL EMPLOYER IDENTIFICATION #: _._._._ _PII TEL. #: (718) 961.4100 ADDRESS: 14.20 129 STREET CITY: COLLEGE POIN STATE: NY ZIP: 11356

VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/0 WARREN & PANZER E

NYS ELAP #: 11251

ASBESTOS WORK SCHEDULE tiG DAY W EVENING NIGHT W WEEKENDS W WEEKDAYS

INSPECTOR NAME: CA'a,. k'f t I CS+L'1'~ SQUAD #: Li BADGE #: ;BI "

' _ / 0 2 TIME OF INSPECTION: From: 6 AM - PM [j DATE OF INSPECTION: , / ~, To: C iA_ AM [J PM `` ~N Contact at site: Diw~ ~ ------- --- Inspection disclosed that the following sections were complied with: (Check all th apply) 1.51 - Notifications, Reports, Pla 71 . Air Sampling and M itorinL. -11 - Worker Protection

1.101 - Materials and Equipment 1.116 -Work Place Prepar ion 1-117 - Worker Decontamination System

1.118 - Waste Decontamination System C 1.126 - Engineering Control 1 1-127 - Entry/Exit Procedures

_ ', 1-129 - Maintenance of Barriers a 1.138 - Encapsulation 1.139. Enclosure

1.140 - Glovebag 1-141 - Tent l 1-137 -ACM Disturbance, Removel, Handling .. __ - - --- _ -- -- - -- ---- ----- L 1.146 - Preliminary Clean-up 1.147 • Final Clean-up

Project not started --- . Inspection

revealed all ACM to be intact- New start date: / /

r Project ongoing, expected completion date: _

i J i Project completed on or about / / . All surfaces, includin abated surfaces are free of visible ACM and encapsulat.

Follow up necessary on / / i ---

Samples taken: 1. 1N0 L- 1 Yes 1 2 3

4 5 6 Photos taken: [ I Yes ; /; No kr«_ Additional comments: plre)k ¢ M 1 %tf L1 «~ r+ Wr Atn 1r10 1GG 44i

Cie 4 aw ` wA r, ~.,. .~ .]rt~L .~ o.' {-r ef+-- - 2,r~4,.. S Z~SL i___--- -- ~'t_

BORO 1 = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEEN4 5 = STATEN ISLAND RESULT coos 1 RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 1 3 = NO ACCESS SUPER RI 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) E

NYC-WTC 000107859

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107859Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →