NYC 9/11 Public Portal Document
TOTAL FEET: 40805 0
NYC DEPARTMENT OF ENVIRONMENT L PROTECTION Basis of Inspection:
ASBESTOS INSPECTION RE SORT LiUO 929MNO2
FEE EXEMPT: Yes
DINLY TYPEWRITTEN 1. $0.00
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL B SUBMITTED
ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK 1 ADVANCE El Variance
OF START OF THE WORK (ABATEMENT A VITIES)
6/20/02 PROJ. COMPL TION DATE: 6/30/02
START DATE:
I. FACILITY
120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHA AN ZIP: 10006
ADDRESS:
BLOCK: 52 LOT: 21
TYPE OFFACILITY:
II. BUILDING OWNER r
NAME: 120 LIBERTY STREET, LLC Contacit
II l —
TEL. #:
CITY: STATE: ZIP:
ADDRESS: N/A
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: #Error
FEDERAL EMPLOYER IDENTIFICATION #: _._._._ _PII
TEL. #: (718) 961.4100
ADDRESS: 14.20 129 STREET CITY: COLLEGE POIN STATE: NY ZIP: 11356
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/0 WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE tiG DAY W EVENING NIGHT W WEEKENDS W WEEKDAYS
INSPECTOR NAME: CA'a,. k'f t I CS+L'1'~ SQUAD #: Li BADGE #: ;BI "
' _ / 0 2 TIME OF INSPECTION: From: 6 AM - PM [j
DATE OF INSPECTION: , /
~, To: C
iA_ AM [J PM
`` ~N
Contact at site: Diw~ ~
------- ---
Inspection disclosed that the following sections were complied with: (Check all th apply)
1.51 - Notifications, Reports, Pla 71 . Air Sampling and M itorinL. -11 - Worker Protection
1.101 - Materials and Equipment 1.116 -Work Place Prepar ion 1-117 - Worker Decontamination System
1.118 - Waste Decontamination System C 1.126 - Engineering Control 1 1-127 - Entry/Exit Procedures
_ ', 1-129 - Maintenance of Barriers a 1.138 - Encapsulation 1.139. Enclosure
1.140 - Glovebag 1-141 - Tent l 1-137 -ACM Disturbance, Removel, Handling
.. __ - - --- _ -- -- - -- ---- -----
L 1.146 - Preliminary Clean-up 1.147 • Final Clean-up
Project not started --- . Inspection
revealed all ACM to be intact- New start date: / /
r Project ongoing, expected completion date: _
i J i Project completed on or about / / . All surfaces, includin abated surfaces are free of visible ACM and encapsulat.
Follow up necessary on / / i ---
Samples taken: 1. 1N0 L- 1 Yes 1 2 3
4 5 6 Photos taken: [ I Yes ; /; No
kr«_
Additional comments: plre)k ¢ M 1 %tf L1 «~ r+ Wr Atn
1r10 1GG 44i
Cie
4
aw ` wA r, ~.,. .~ .]rt~L .~ o.' {-r
ef+-- - 2,r~4,.. S Z~SL i___--- --
~'t_
BORO 1 = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEEN4 5 = STATEN ISLAND
RESULT coos
1
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 1 3 = NO ACCESS SUPER RI
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
E
NYC-WTC 000107859
OCR can misread numbers and units. Confirm readings against the page image before using them.