Asbestos inspection report form, June 2002

Machine-extracted title · confidence 75%

NYC DEP asbestos inspection report documenting facility assessment with variance approval for work commencing June 20, 2002.

NYC-WTC_000107869–000107872

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107871
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TOTAL FEET: 40805 0

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection: ASBESTOS INSPECTION RE~ORT - I TRU0929MN02 FEE EXEMPT: Yes ONLY TYPEWRITTEN SUBMITTED 1. $0.00 APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL I ACCEPTED TO NYC DEP NOT LESS THAN ONE WEEK ADVANCE LI Variance OF START OF THE WORK (ABATEMENT A 6/20/02 PROJ. COMP DATE: 6/30/02 START DATE:

I. FACILITY 120 LIBERTY ST./ 125 CEDAR ST. BORO: MANHAT fAN ZIP: 10006 ADDRESS: BLOCK: 52 LOT: 21 TYPE OFFACILITY: 11. BUILDING OWNER —r Contac NAME: 120 LIBERTY STREET, LLC -- -- - TEL. #: CITY: STATE ZIP: ADDRESS: N/A IV. ASBESTOS ABATEMENT CONTRACTOR NAME: #Error -.-.-.-- PII TEL. #: (718)961.4100 FEDERAL EMPLOYER IDENTIFICATION #[ CITY: COLLEGE POINT STATE: NY ZIP: 11356 ADDRESS: 14-20 129 STREET VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E NYS ELAP #: 11251 DAY EVENING NIGHT WEEKENDS IiG WEEKDAYS ASBESTOS WK SCHEDJLE c_ L SQUAD #: BADGE l5 INSPECTOR NAME: N: DATE OF INSPECTION: j / y( / 0~ TIME OF INSPECTION: From: f AM >t .PM El r—

Contact at site: ~ _C 1 91To: , • Ov AM r PM

Inspection sclosed that the following sections were complied with: (Check all thaF apply) 1.51 - Notifications, Reports, Pla 1-71 - Air Sampling and Mo itorin 91 -Worker Protection

1-101 - Materials and Equipment 1-116- Work Place Prepara ion u —Iii7 - Worker Decontamination System j LII i 1-118 - Waste Decontamination System U 1.126 - Engineering Control 127 - Entry/Exit Procedures _

1-129 - Maintenance of Barriers 1-138 - Encapsulation U 1139 -Enclosure

1-140- Glovebag 1.141 - Tent r 1137 - ACM Disturbance, RemoveL, Handling

1-146 - Preliminary Clean-up r 1-147 - Final Cleanup

Project not started . Inspection ,

revea d all ACM to be intact. New start date: / /_

Project ongoing, expected completion date: / /

Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat !

Follow up necessary on / / — — Samples taken: No ! 1 Yes 1 2 3 --__ 3 i_ _ ; 5 6 Photos taken: Yes [ No 4 Additional comments ,.` .~p V ~ ~ — i

RESULT CODE BORO 1 = MANHATTAN 2 = BRONX 3 = BROOOKLYN 4 = QUEEN$ 5 = STATEN ISLAND

RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPER 4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV) I

NYC-WTC 000107871

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107871Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →