ALLOWANCE FOR INCIDENTAL ASBESTOS ABATEMENT
Contractors who may be brought upon any site of the work of this Contract. This
paragraph applies to those areas outside the regulated Work Area as defined by
Title 15, Chapter I of RCNY.
1.12 LOG
A. The Contractor shall provide a permanently Bound logbook of minimum 8-1/2" X
11" size. Log book shall contain on title page the project name, name, address and
phone number of Agency Representative; name, address and phone number of
Contractor; name, address and phone number of Contractor's and City's air testing
entity; emergency phone numbers including, but not limited to local Fire/Rescue
Department. Log book shall contain a list of personnel approved for entiy into the
Work Area
B. All entries into the log sill be made in non-washable, permanent ink and such pen
shall be strung to or otherwise attached to the log to prevent removal from the
log-in area. Under no circumstance shall pencil entries be permitted.
Upon completion of the job and as a condition of its acceptance, submit the job
logbook containing day-to-day record of personnel entering the Work Area, and
any significant event occurring during the abatement of the project. Daily log
entries shall be countersigned by the Resident Engineer every day.
1.13 PROTECTION OF FURNITURE AND EQUIPMENT
A. Cover all furniture and equipment that cannot be removed from Work Areas.
Movable furniture and equipment will be removed from Work Areas by the
Contractor prior to start of work. At the conclusion of the work (after fmal air
testing), the Contractor will remove all plastic covering on walls, floors, furniture,
equipment and reinstall furniture and equipment. He shall remove and store all
sheaths, curtains and drapes, and reinstall same following final clean up.
1.14 UTILITIES
A. General:
All temporary facilities shall be subject to the approval of the Commissioner.
Prior to starting work at any site, locations and/or sketches (if required) of
temporary facilities must be submitted to the Resident Engineer for the required
approval.
B. Water:
The Department of Design and Construction will furnish all water needed for
construction, at no cost to the Contractor in buildings under their jurisdiction.
However, it is the responsibility of the Contractor to ensure that hot water is
provided for showering in the decontamination unit. The Contractor shall furnish.
CAPITAL PROJECT NUMBER XXXXX 01020-1 02
100% CONTRACT DOCUMENTS REV. 0: DATE
CITY_21MC100_006631351
NYC-WTC_000416863
OCR can misread numbers and units. Confirm readings against the page image before using them.