SECTION 02082
The Department of Design and Construction, at its option, may terminate this Contract at any
time upon written notice to the Contractor, in which event the Department of Design and
Construction shall be liable for payment to the Contractor only for the work satisfactorily
completed up to and including the date of termination of the Contract. The Contractor shall
perform all work in an expeditious workmanlike manner. Unnecessary delays in completing the
work ordered may result in cancellation of this Contract.
1.08 SCAFFOLDING
A. The Contractor shall furnish all the scaffolding of whatever type is necessary to do the
work of this Contract, subject to requirements of the Building Code of the City of New
York and the approval of the Commissioner.
B. Any scaffolding used, erected and later dismantled must be employed in a manner that
does not damage the walls or floors of the Work Area. Any damage caused by the
Contractor in the course of his operations must be repaired at no cost to the City and to
the satisfaction of the Commissioner.
C. The area below the scaffolding shall be cordoned off (with a visible barrier such as
asbestos hazard caution tape clearly identifying the work area boundaries) as a restricted
area for certified asbestos personnel only. The abatement contractor shall regulate all
access to his area.
1.09 LOG
A. The Contractor shall provide a permanently bound log book of minimum 8-1/2" x 11"
size at the entrance to the Worker and Waste Decontamination’s enclosure system as
hereinafter specified. Log book shall contain on title page the project name, name,
address and phone number of Owners; name address and phone number of
Environmental Control Representative; name, address and phone number of Abatement
Contractor; name, name, address and phone number of the Constnxction Manager-
address and phone number of Contractor’s and Construction Manager’s air testing entity;
emergency numbers including, but not limited to local Fire/Rescue Department. Log
book shall contain a list of personnel approved by the laboratory for entry into the Work
Area.
B. All entries into the log shall be made in non-washable, permanent ink and such pen shall
be strung to or otherwise attached to the log to prevent removal from the log-in area.
Under no circumstances shall pencil entries be permitted.
Upon completion of the job and as a condition of its acceptance, submit the job log book
containing day-to-day record of personnel entering the Work Area and any significant
event occurring during the abatement project. Daily log entries shall be countersigned by
the Construction Manager everyday.