SECTION 02082
1.10 TELEPHONE PAGING DEVICE
The Contractor or his authorized representative shall, at all times during the normal workday or
during periods of oveiiime work under this Contract, carry a digital telephone paging device
("Beeper") and/or cellular telephone which can be activated by a telephone number in the 212 or
718 or 917 area code. He shall supply to the Department of Design and Construction with the
activation number for the device and he is liable to respond back to the calls from DDC within
the next one (1) hour period after he receives the calls from DDC. The cost to the Contractor for
this device and all charges accruing thereto is deemed included in the Bid.
1.11 PROTECTIVE EQUIPMENT FOR CONSTRUCTION MANAGER
In addition to personal protective equipment for workers, the Contractor shall make available at
each worksite at least four (4) additional uniforms and required respiratory equipment each day
for personnel who are authorized to inspect the work site. He/she shall also provide, for the
duration of the work at any site involving a decontamination unit for worksite access, a lockable
storage locker for use by the Construction Manager. In addition to respiratory masks for
workers, the Contractor must have on hand at the beginning of each workday, at least four (4)
masks each with two sets of fresh filters, for use by personnel who are authorized to inspect the
worksite. The Contractor shall check for proper fit of the respirators of all City personnel
authorized to enter the Work Area.
1.12 PROTECTION OF FURNITURE, EQUIPMENT AND WORK SITE
The Contractor is responsible to cover all furniture and equipment that cannot be removed from
Work Areas. Moveable furniture and equipment will be removed from Work Areas by
Contractor prior to start of work and returned upon successful completion of the final air testing.
At the conclusion of the work (after clearance level of air testing reaches to the acceptable limit),
the Contractor will remove all plastic covering from walls, floors, furniture, equipment, and
reinstall furniture and equipment in the cleaned Work Area. He shall remove all shades, curtains
and drapers from Work Area, and reinstall the same following the final clean-up.
A. Use rubber-tired vehicles that use non-volatile fuels for conveying material inside
building and provide temporary covering, as necessary, to protect floors.
B. No materials or debris shall be thrown from windows or doors of the building. Building
waste system shall NOT be used to remove refuse.
C. Debris shall be removed from the work site daily. Premises shall be left neat and clean
after each work shift, so that work may proceed for the next regular workday without
interruption. Limited bag storage may take place within the Work Area when approved
by the Resident Engineer and Construction Manager.
D. Protect floors and walls along removal routes from damage, wear and staining with
contamination control flooring. All finished surfaces to be protected with masonite or
other rigid sheathing material.