9 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209450
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000209450–000209459
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Scope of Work B
Application; A visual inspection was performed and large or significant accumulations ofdust or debris from the collapse ofthe WTC was observed in common spiaces, residences or portions thereof (such as windows, terraces or balconies).
Residents will not be allowed in the work area. Residents maybe present in the residence during cleaning in cases where the work .area can be isolated by the erection ofisolation barriers. In all other applications of Scope B it is assumed that residents will not be present in the residence.
1. The cleaning contractor shall meet with EP A or the Project Monitor if requested, to discuss site specific proc«;dures for debris removal, isolation of the work space and worker decontamination.
2. An asbestos p roject notification form (NYC’ form ACP-7) shall be submitted, as required by Title 15, Chapter 1 ofthe Rules ofthe City ofNew York (RCNY), directlyto the NYCDEP Asbestos Control Progi'am prior to the start of work. NYS DOL notification may also be required.
3. At least one asbestos supervisor shall be present at each work place (work place is defined in Title 15, Chapter 1 of RCNY as the work area and the decontamination enclosure system).
4. Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this cleaning activity.
5. Warning signs shall be posted at all of the approach to the work area.
6. A decontamination enclosure system shall be installed at the entrance to the work area. The shower room shall be equipped with at least a 6-foot flexible hose for waste decontamination. A remote holding area with a lockable door for waste shall be located at the site and shall comply with all applicable storage rules and regulations. Waste removal shall not occur during worker shift changes or when workers are showering or changing. An entry/exit log in compliance with the requirements set forth in Title 15, Chapter 1 of RCNY" shall be maintained in the clean room. A remote decontamination enclosure system shall be considered when appropriate, i.e. inability to comply with the provision due to space limitation or other agency rules, such as for compliance with New York City Fire Department egress requirements.
7. HVAC systems shall be shut down and locked out or isolated locally.
8. Isolation barriers shall be installed with two layers of 6-mil polyethylene sheeting and sealed with tape.
9. Negative pressure ventilation equipment shall be installed and operated during all cleaning activities.
8
CITY_21MC100_000438946 NYC-WTC_000209457
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000140615
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings near the World Trade Center.
10 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097177
Permit application requesting licensed asbestos contractors to clean debris and dust from the interior of 125 Cedar Street.
10 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
10 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140443
Draft contract scope outlining compliance requirements and a direct assistance program for residents south of Canal Street.
10 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140420
Draft contract outlining compliance requirements and direct assistance program details for residential dust cleaning south of Canal Street.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140551
Draft contract scope for WTC dust cleaning south of Canal Street including asbestos sampling and HEPA vacuuming.
10 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151471
Letter advising EPA that DEP's Bureau of Environmental Compliance reviewed the draft cleaning contract scope for World Trade Center indoor dust cleaning.
9 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140489
Draft scope of work for a DEP and EPA program providing cleaning assistance to residents south of Canal Street.
10 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140481
Draft contract scope defining compliance requirements and assistance programs for cleaning World Trade Center dust in residences.
10 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154306
Letter from DEP Bureau of Environmental Compliance reviewing the draft scope of work for the World Trade Center indoor dust cleaning program.
9 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154317
Draft document outlining procedures for asbestos removal and HEPA vacuuming in residential buildings south of Canal Street following the World Trade Center collapse.
8 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000140615
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings near the World Trade Center.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139101
EPA transmits revised scopes of work documents for the indoor dust cleaning and monitoring program, including cleaning SOW #7 and monitoring SOW #7.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163328
Distribution to environmental organizations, legal advocates, health agencies, unions, and academic institutions.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138774
EPA provides final versions of scopes of work for the WTC indoor dust cleaning program.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140443
Draft contract scope outlining compliance requirements and a direct assistance program for residents south of Canal Street.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000140615
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings near the World Trade Center.
Similar indexed content
NYC-WTC_000097177
Permit application requesting licensed asbestos contractors to clean debris and dust from the interior of 125 Cedar Street.
Similar indexed content
NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similar indexed content
Draft contract scope outlining compliance requirements and a direct assistance program for residents south of Canal Street.
Similar indexed content
NYC-WTC_000140420
Draft contract outlining compliance requirements and direct assistance program details for residential dust cleaning south of Canal Street.
Similar indexed content