NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 84 pages

Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 event occurring during the abatement project. Daily log entries shall be countersigned by the Construction Manager everyday.

1.10 TELEPHONE PAGING DEVICE

The Contractor or his authorized representative shall, at all times during the normal workday or during periods of overtime work under this Contract, carry a digital telephone paging device ("Beeper") and/or cellular telephone which can be activated by a telephone number in the 212 or 718 or 917 area code. He shall supply to the Department of Design and Construction with the activation number for the device and he is liable to respond back to the calls from DDC within the next one (1) hour period after he receives the calls from DDC. The cost to the Contractor for this device and all charges accruing thereto is deemed included in the Bid.

1.11 PROTECTIVE EQUIPMENT FOR CONSTRUCTION MANAGER

In addition to personal protective equipment for workers, the Contractor shall make available at each worksite at least four (4) additional uniforms and required respiratory equipment each day for personnel who are authorized to inspect the work site. He/she shall also provide, for the duration of the work at any site involving a decontamination unit for worksite access, a lockable storage locker for use by the Construction Manager. In addition to respiratory masks for workers, the Contractor must have on hand at the beginning of each workday, at least four (4) masks each with two sets of fresh filters, for use by personnel who are authorized to inspect the worksite. The Contractor shall check for proper fit of the respirators of all City personnel authorized to enter the Work Area.

1.12 PROTECTION OF FURNITURE, EQUIPMENT AND WORK SITE

The Contractor is responsible to cover all furniture and equipment that cannot be removed from Work Areas. Moveable furniture and equipment will be removed from Work Areas by Contractor prior to start of work and returned upon successful completion of the final air testing. At the conclusion of the work (after clearance level of air testing reaches to the acceptable limit), the Contractor will remove all plastic covering from walls, floors, furniture, equipment, and reinstall furniture and equipment in the cleaned Work Area. He shall remove all shades, curtains and drapers from Work Area, and reinstall the same following the final clean-up.

A. Use rubber-tired vehicles that use non-volatile fuels for conveying material inside building and provide temporary covering, as necessary, to protect floors.

B. No materials or debris shall be thrown from windows or doors of the building. Building waste system shall NOT be used to remove refuse.

C. Debris shall be removed from the work site daily. Premises shall be left neat and clean after each work shift, so that work may proceed for the next regular workday without interruption. Limited bag storage may take place within the Work Area when approved by the Resident Engineer and Construction Manager.

D. Protect floors and walls along removal routes from damage, wear and staining with

02082-13

CITY_21 MCI 00_014563869

NYC-WTC_000455940

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455940Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →