Abatement specifications, exterior sealants, P.S. 92M

Machine-extracted title · confidence 45%

CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 as defined by Title 15, Chapter 1 of RCNY.

1.07 CANCELLATION

The Department of Design and Construction, at its option, may terminate this Contract at any time upon written notice to the Contractor, in which event the Department of Design and Construction shall be liable for payment to the Contractor only for the work satisfactorily completed up to and including the date of termination of the Contract. The Contractor shall perform all work in an expeditious workmanlike manner. Unnecessary delays in completing the work ordered may result in cancellation of this Contract.

1.08 SCAFFOLDING

A. The Contractor shall furnish all the scaffolding of whatever type is necessary to do the work of this Contract, subject to requirements of the Building Code of the City of New York and the approval of the Commissioner.

B. Any scaffolding used, erected and later dismantled must be employed in a manner that does not damage the walls or floors of the Work Area. Any damage caused by the Contractor in the course of his operations must be repaired at no cost to the City and to the satisfaction of the Commissioner.

C. The area below the scaffolding shall be cordoned off (with a visible barrier such as asbestos hazard caution tape clearly identifying the work area boundaries) as a restricted area for certified asbestos personnel only. The abatement contractor shall regulate all access to his area.

1.09 LOG

A. The Contractor shall provide a permanently bound log book of minimum 8-1/2" x 11" size at the entrance to the Worker and Waste Decontamination’s enclosure system as hereinafter specified. Log book shall contain on title page the project name, name, address and phone number of Owners; name address and phone number of Environmental Control Representative; name, address and phone number of Abatement Contractor; name, name, address and phone number of the Construction Manager; address and phone number of Contractor’s and Construction Manager’s air testing entity; emergency numbers including, but not limited to local Fire/Rescue Department. Log book shall contain a list of personnel approved by the laboratory for entry into the Work Area.

B. All entries into the log shall be made in non-washable, permanent ink and such pen shall be strung to or otherwise attached to the log to prevent removal from the log-in area. Under no circumstances shall pencil entries be permitted.

Upon completion of the job and as a condition of its acceptance, submit the job log book containing day-to-day record of personnel entering the Work Area and any significant

02082-12

CITY_21 MCI 00_014563868

NYC-WTC_000455939

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455939Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →