CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.

NYC-WTC_000455928–000456011
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082 the experience requirements set forth above. Compliance with such experience requirements will be determined by the City.

9 In the event the Bidder is a joint venture, at least one firm in the joint venture must meet the above described requirements.

D. Insurance Requirements: The asbestos contractor must provide asbestos liability insurance in the following amount: 1 million dollars per occurrence, 2 million dollar aggregate (combine single limit). The City of New York shall be named as an additional insured on such insurance policy.

E. Throughout the Specifications, reference is made to codes and standards which establish qualities and types of workmanship and materials, and which establish methods for testing and reporting on the pertinent characteristics thereof.

Where materials or workmanship are required by these Specifications to meet or exceed the specifically named code or standard, it is the Contractor’s responsibility to provide materials and workmanship, which meet or exceed the specifically named code or standard.

F. Site Investigation: The Contractor will inspect all the Specifications, drawings and will investigate and confirm the Conditions affecting the work, including but not limited to:

1. The physical considerations and conditions of both the material and structure. These considerations include any obstacles or obstruction encountered in accessing or removing the material.

9 The handling, storage, transportation and disposal of the material.

3. The availability of qualified and skilled labor.

4. The availability of utilities.

5. The exact quantity of all material to be disturbed.

6. Be familiar and comply with all applicable Local, State, Federal rules and regulations.

1.05 WORK BY OTHERS

The Department of Design and Construction reserves the right during the term of this Contract to have work performed on asbestos abatement projects by other Contractors, and/or their own shop mechanics as circumstances warrant.

1.06 OCCUPANCY OF SITE NOT EXCLUSIVE

Attention is specifically drawn to the fact that Contractors, performing the work of other Contracts, may be brought upon any of the work sites of this Contract. Therefore, the Contractor shall not have exclusive rights to any site of his work and shall fully cooperate and coordinate his work with the work of other Contractors who may be brought upon any site of the work of this Contract. The preceding paragraph applies to those areas outside the regulated Work Area

02082-11

CITY_21 MCI 00_014563867

NYC-WTC_000455938

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000455938Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →