NYC 9/11 Public Portal Document
SECTION 02082
2. In the event the Bidder is a joint venture, at least one firm in the joint venture must meet
the above described requirements.
D. Insurance Requirements: The asbestos contractor must provide asbestos liability insurance in the
following amount: 1 million dollars per occurrence, 2 million dollar aggregate (combine single
limit). The City of New York shall be named as an additional insured on such insurance policy.
E. Throughout the Specifications, reference is made to codes and standards which establish qualities
and types of workmanship and materials, and which establish methods for testing and reporting
on the pertinent characteristics thereof.
Where materials or workmanship are required by these Specifications to meet or exceed the
specifically named code or standard, it is the Contractor’s responsibility to provide materials and
workmanship, which meet or exceed the specifically named code or standard.
F. Site Investigation: The Contractor will inspect all the Specifications, drawings and will
investigate and confirm the Conditions affecting the work, including but not limited to:
1. The physical considerations and conditions of both the material and structure. These
considerations include any obstacles or obstruction encountered in accessing or removing
the material.
9 The handling, storage, transportation and disposal of the material.
3. The availability of qualified and skilled labor.
4. The availability of utilities.
5. The exact quantity of all material to be disturbed.
6. Be familiar and comply with all applicable Local, State, Federal rules and regulations.
1.05 WORK BY OTHERS
The Department of Design and Construction reserves the right during the term of this Contract to
have work performed on asbestos abatement projects by other Contractors, and/or their own shop
mechanics as circumstances warrant.
1.06 OCCUPANCY OF SITE NOT EXCLUSIVE
Attention is specifically drawn to the fact that Contractors, performing the work of other
Contracts, may be brought upon any of the work sites of this Contract. Therefore, the Contractor
shall not have exclusive rights to any site of his work and shall fully cooperate and coordinate
his work with the work of other Contractors who may be brought upon any site of the work of
this Contract. The preceding paragraph applies to those areas outside the regulated Work Area
as defined by Title 15, Chapter 1 of RCNY.
1.07 CANCELLATION
02082-11