Asbestos Abatement
standards which establish qualities, levels or types of workmanship which will be
considered acceptable. It is the Abatement Contractor's responsibility to comply
with these codes and standards during the execution of this work.
B. All materials and equipment required or consumed during the work of this
Contract must meet the minimum acceptable criteria established by codes and
standards referenced elsewhere in this Specification. Materials and equipment
must be submitted for prior approval as part of the Contractor's "Shop Drawings".
C. It is the Abatement Contractor's responsibility, when so required by the
Specification or upon written request from the Commissioner or his representative
to furnish all required proof that workmanship, materials and/or equipment meet
or exceed the codes and standards referenced. Such proof shall be in the form
requested, typically a certified report or test conducted by a testing entity
approved for that purpose by DDC.
D. The Contractor shall furnish proof that employees working under his supervision
have had instruction on the dangers of asbestos exposure, on respirator use,
decontamination, and OSHA regulations. This proof shall be in the form of a
notarized affidavit to the effect that the above requirements have been satisfied.
E. The Contractor will have at all times in his possession and in view at the job site
the OSHA regulations 29 CFR 1910.1001, and 1926.58 Asbestos, and
Environmental Protection Agency 40 CFR, Part 61, subpart B: National Emission
Standard for asbestos, asbestos stripping, work practices and disposal of asbestos
waste. He shall also have one copy of NYC Title 15, Chapter 1 of RCNY and
NYS DOE ICR 56 at the job site at all times.
F. Familiarity with Pertinent Codes and Standards: In procuring all items used in this
work, it is the Contractor's responsibility to verify the detailed requirements of the
specifically named codes and standards and to verify that the items procured for
use in this work meet or exceed the specified requirements, and are suitable for
their intended use.
G. Rejection of Non Complying Items: The Commissioner reseiwes the right to reject
items incorporated into the work that fail to meet the specified minimum
requirements. The Commissioner further reserves the right, and without prejudice
to other recourse that maybe taken, to accept non-complying items subject to an
adjustment in the Contract amount as approved by the City.
H. Applicable Regulations, Codes and Standards: Applicable standards listed in
these Specifications include, but are not necessarily limited to, standards
promulgated by the following agencies and organizations:
CAPITAL PROJECT NUMBER PO79201K 02081-27
100: CONTRACT DOCUMENTS REV. May 3,2000