Asbestos Abatement
1. Security and safety logs showing names of person entering work
space, date and time of entry and exit, record of any accident,
emergency evacuation, and any other safety and/or health incident.
2. Progress logs showing the number of workers, supervisors, hours
of work and tasks completed shall be submitted daily to the
Resident Engineer.
3. Floor plans indicating Contractor's current work progress shall be
submitted for review by the Resident Engineer at weekly progress
meetings.
4. All Contractor's air monitoring and inspection results.
C. Project Closeout Submittals
1. Upon completion of the project and as a condition of acceptance,
the Contractor shall present two copies of the following items,
bound and indexed::
a. Lien Waivers from Contractor, Sub-Contractors and Suppliers,
b. Daily OSHA air monitoring results.
c. All Waste Manifests (Asbestos and Construction Debris), seals and
disposal logs.
d. Field Sign-In/Sign-Out Logs for every shift.
e. Copies of all Building Department Forms and Permits,
f. A Letter of Compliance stating that all the work on this project
was performed in accordance with the Specifications and all
applicable Federal, State and Local regulations.
g. All Warranties as stated in the Specifications,
h. Fully executed disposal certificates and transportation
manifest.
1.10 QUALITY ASSURANCE
A. All work required for the completion of this project or called for in this
Specification must be executed in a workmanlike manner by using the appropriate
methods established by regulatory requirements and/or industrial standards. All
workmanship or work methods are subject to review and acceptance by the
Resident Engineer. Throughout the Specification, reference is made to codes and
CAPITAL PROJECT NUMBER PO79201K 02081-26
100: CONTRACT DOCUMENTS REV. May 3,2000
- 26 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631275
NYC-WTC_000416787
OCR can misread numbers and units. Confirm readings against the page image before using them.