NYC 9/11 Public Portal Document
Asbestos Abatement
firestopping foam, cleaners/disinfectants, spray adhesive, and any
and all potentially hazardous materials that may be employed on
the project. No work involving the aforementioned will be allowed
to proceed until MSDS are reviewed and approved by the Resident
Engineer.
P- Worker Training and Medical Surveillance: Contractor shall
submit a list of the persons who will be employed by him and his
Subcontractors in the removal work. Present evidence that workers
have received proper training required by the regulations and the
medical examinations required by OSHA 29 CFR 1926.58.
q. Logs: Specimen copies of daily progress log, visitor's log, and
disposal log.
(1) The Contractor shall provide a permanently bound log
book of minimum 8-1/2" x 11" size at the entrance to the
Worker and Waste Decontamination enclosure system as
hereinafter specified. Log book shall contain on title page
the project name, name, address and phone number of
Environmental Control Representative; name, address and
phone number of Abatement Contractor; name, address
and phone number of Contractor and City's air testing
entity; emergency numbers including, but not limited to
local Fire/Rescue Department. Log book shall contain a
list of personnel approved by the laboratory for entry into
the Work Area.
(2) All entries into the log shall be made in non-washable,
permanent ink and such pen shall be strung to or otherwise
attached to the log to prevent removal from the log-in area.
Linder no circumstances shall pencil entries be permitted.
Any significant events occurring during the abatement
project shall be entered into the log. Upon completion of
the job, the Contractor shall submit the log book containing
a day-to-day record of personnel log entries countersigned
by the Resident Engineer everyday.
r. Worker's Acknowledgments: Submit statements signed by each
employee that the employee has received training in the proper
handling of ACM' understands the health implications and risks
involved; and understands the use and limitations of the respiratory
equipment to be used.
B. Submit copies of the following items to the Resident Engineer during the work:
CAPITAL PROJECT NUMBER PO79201K 02081-25
100: CONTRACT DOCUMENTS REV. May 3,2000
- 25 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631274
NYC-WTC_000416786
OCR can misread numbers and units. Confirm readings against the page image before using them.