NYC 9/11 Public Portal Document
SECTION 02082
of New York Department of Design and Construction.
n. Written description of emergency procedures to be followed in case of
injury, fire or fiber dispersal. This section must include evacuation
procedures, source of medical assistance (name and telephone number)
and procedures to be used for access by medical personnel (examples: first
aid squad and physician). NOTE: Necessary Emergency Procedures Shall
Take Priority Over All Other Requirements of These Specifications.
o. Material Safety Data Sheets (MSDS) for encapsulants, sealants,
firestopping foam, cleaners/disinfectants, spray adhesive, and any and all
potentially hazardous materials that may be employed on the project. No
work involving the aforementioned will be allowed to proceed until
MSDS are reviewed and approved by the Resident Engineer.
P- Worker Training and Medical Surveillance: Contractor shall submit a list
of the persons who will be employed by him and his Subcontractors in the
removal work. Present evidence that workers have received proper
training required by the regulations and the medical examinations required
by OSHA 29 CFR 1926.1101.
q- Logs: Specimen copies of daily progress log, visitor's log, and disposal
log.
(1) The Contractor shall provide a permanently bound logbook of
minimum 8-1/2” x 11” size at the entrance to the Worker and
Waste Decontamination enclosure system as hereinafter specified.
Log book shall contain on title page the project name, name,
address and phone number of Environmental Control
Representative; name, address and phone number of Abatement
Contractor; name, address and phone number of Contractor and
City’s air testing entity; emergency numbers including, but not
limited to local Fire/Rescue Department. Logbook shall contain a
list of personnel approved by the laboratory for entry into the
Work Area.
(2) All entries into the log shall be made in non-washable, permanent
ink and such pen shall be strung to or otherwise attached to the log
to prevent removal from the log-in area. Under no circumstances
shall pencil entries be permitted. Any significant events occurring
during the abatement project shall be entered into the log. Upon
completion of the job, the Contractor shall submit the logbook
containing a day-to-day record of personnel log entries counter
signed by the Resident Engineer everyday.
a. Worker's Acknowledgments: Submit statements signed by
each employee that the employee has received training in
the proper handling of ACM understands the health
02082-28
CITY_21 MCI 00_014563801
NYC-WTC_000454601
OCR can misread numbers and units. Confirm readings against the page image before using them.