Exterior sealant/caulking abatement specs, P.S. 92M

Machine-extracted title · confidence 53%

Specifications for asbestos-containing exterior sealants and caulking materials abatement.

NYC-WTC_000454574–000454656
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

SECTION 02082

d. Schedules: the Contractor shall provide to the Resident Engineer and Construction manager a copy of the following schedules for approval. Once approved, schedules shall be maintained and updated as received. Contractor shall post a copy of all schedules at the site:

1) A construction schedule stating critical dates of the project including, but not limited to, mobilization. Work Area preparation, demolition, gross removal, fine cleaning, encapsulation, inspections, clearance monitoring, and phase of refinishing and final inspections. The schedule shall be updated biweekly, at a minimum.

2) A schedule of staffing stating number of workers per shift per activity, name and number of supervisor(s) per shift, shifts per day, and total days to be worked.

3) Submit all changes in schedule or staffing to the Resident Engineer prior to implementation. 4) A schedule of equipment to be used including numbers and types of all major equipment such as HEPA Air Eiltration Units, HEPA- vacuums, airless sprayers. Water Atomizing Devices and Type "C" compressors. e. A written plan and shop drawings for preparation of work site and decontamination chamber.

f. Description of protective clothing and approved respirator to be used, make, model, NIOSH approval numbers.

g- Delineation of responsibility of work site supervision, including competent person, with names, resumes, and home telephone numbers.

h. Explanation of decontamination sequence and isolation techniques.

i. Description of specific equipment to be utilized, including make and model number of air filtration devices, vacuums, sprayers, etc.

j- Description of any prepared methods, procedures, techniques, or equipment other than those specified in the Contract Documents.

k. Explanation of the handling of contaminated wastes including EPA and NYCDEP identification numbers of Waste Hauler.

1. Description of the final clean-up procedures to be used.

m. Name and qualifications of Contractor's testing laboratory including AIHA accreditation, and proof of NIOSH PAT and NIST/NVEAP Bulk Quality Assurance Proficiency of OSHA samples for approval by the City

02082-27

CITY_21 MCI 00_014563800

NYC-WTC_000454600

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454600Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →