December 17, 2002 114 LIBERTY STREET REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS
02 PROJECT COORDINATION
PART 1 - GENERAL
1.01 NOTIFICATIONS:
A. The Contractor shall make all required notifications associated with this contract to include, but not limited to, those listed in Section 04 Codes, Regulations and Standards.
1.02 ADMINISTRATIVE AND SUPERVISORY PERSONNEL:
A. Provide a qualified Supervisor for continuous supervision of all work, and to be responsible for the following:
1. Ensure that individuals are wearing proper personal protective equipment and are trained in its use.
2. Maintain entry log records.
3. Surveillance of the work areas at a minimum of once per work shift, to ensure that the workers' personal protective equipment is not torn or ripped and that respiratory protection is worn at all times. Document all inspections in the project log.
4. Ensure that sufficient personal protective equipment is stored in the clean room.
5. Take precautions to prevent heat stress from occurring, such as selecting lightweight protective clothing, reducing the work rate, and providing adequate fluid breaks.
1.03 PRE-PROJECT MEETING:
A. The Contractor shall attend a pre-project meeting as scheduled. This meeting shall also be attended by the Owner, Ambient Group, and (if they desire) a designated project representative from each Tenant. At this meeting, the Contractor shall present copies of the following items, bound and indexed.
1. Schedules: the Contractor shall provide to the Owner a copy of the following schedules for approval. Once approved, schedules shall be maintained and updated as received. Contractor shall post a copy of all schedules at the site:
a. A project schedule stating critical dates of the project including start and completion of (at a minimum) mobilization, Work Area preparation, demolition, gross removal, fine cleaning, inspection, clearance testing and demobilization. The schedule shall be updated weekly.
b. A schedule of staffing stating the number of workers per shift per activity, name and number of supervisor(s) per shift, shifts per day, and total days to be worked. Submit all changes in schedule or staffing to the Owner and Ambient Group, Inc.
10 © AMBIENT GROUP, INC. -2002
PROJECT COORDINATION
NYC-WTC 000155538
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
47 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
48 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155168
Draft cleaning procedures and contract documentation for 114 Liberty with minor revisions, shared with EPA for review and comment.
12 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
12 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107169
Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
17 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162906
Document tracking the chain of custody for environmental monitoring samples at 114 Liberty Street on February 7, 2003.
14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107535
Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
17 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155635
Submission of contract changes to scope documents awaiting final approval and bidder lists.
14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 16 pages · confidence 0.70 · verify page 79
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Cited alongside this record in an Ask answer
NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer