Asbestos Abatement
methods for testing and reporting on the pertinent characteristics thereof.
Provide materials or workmanship that meet or exceed the specifically named
codes or standards where required by these specifications.
IT. Site Investigation: Contractor shall inspect all the specifications and related
drawings, and will investigate and confirm the site conditions affecting the
work, including but not limited to:
1. Physical considerations and conditions of both the material and
structure. These considerations include any obstacles or
obstructions encountered in accessing or removing the material.
2. Handling, storage, transportation and disposal of the material.
3. Availability of qualified and skilled labor.
4. Availability of utilities.
5. Exact quantities of all materials to be disturbed and/or removed.
1.04 WORK BY OTHERS
A. The City reserves the right during the term of this Contract to have work
performed on asbestos abatement projects by other Contractors, and/or their own
shop mechanics as the situation warrants.
1.05 DEFINITIONS
A. General Explanation: Certain terms used in this Specification Section are defined
below. Definitions and explanations of this Specification Section are not necessarily
complete or exclusive, but are general for the Work to the extent they are not stated
more explicitly in another element of the Contract Documents.
B. Definitions in General Use:
1. Approve: Where used in conjunction with Engineer's response to submittals,
requests, applications, inquiries, reports and claims by Contractor, the
meaning of term "approved" will be held to limitations of Engineer's
responsibilities and duties as specified in Contract Documents. In no case
will "approval" by Engineer be interpreted as a release of Contractor from
responsibilities to fulfill requirements of Contract Documents.
2. Directed, Requested, etc.: Where not otherwise explained, terms such as
"directed," "requested," "authorized," "selected," "approved," "required,"
"accepted," and "permitted" mean "directed by Engineer," "requested by
Engineer," and similar phrases. However, no such implied meaning will be
CAPITAL PROJECT NUMBER PO79201K 02081-1 0
100: CONTRACT DOCUMENTS REV. May 3,2000
- 1 0 -100% CONTRACT DOCUMENTS
REV. 0: DATE
CITY_21MC100_006631259
NYC-WTC_000416771