NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date.
130 Liberty Street 02/19/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 ■ 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze_____ F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:00 pm to 2:15 pm
I arrived at the premise at 1:00 pm, proceeded to the decon, signed the log book, don the appropriate level of
personal protective equipment to enter the regulated area on 4“’loor. One worker was present for the decon
maintenance, organizing the clean room. Negative air pressure was 0.035.
4"’ Floor - 26 workers were on the floor, filling up the pipes with foam, covering holes on the floor, re-sealing
critical barriers, cleaning the top of tents, wrapping cables, sweeping and vacuuming the floor with equipment
equipped with HEPA filter, clearing off the floor. Inspection was done on micro trap machines and tents.
I observed that two micro trap machines were powered off. Handler Supervisor was advised to call the
electricians for immediate inspection. After following the decontamination procedure I signed the log book and
used south hoist to proceed to the 3'“ floor decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area. One person was present for the decon maintenance.
3"* Floor - 45 workers were working on the floor. Platinum Electricians were in the process of cutting pipes and
removing the electrical cables. Carpenters putting platforms across shaft; re-sealing critical barriers,
demolishing the wall; removing metals from the ceiling using scissor lift, cutting metal with the tools attached to
the HEPA vacuum, wrapping beams with poly. Others were loading out boxes and poly wrapped beams,
picking up debris, preparing boxes. 12 sealed and sprayed Gaylord boxes were ready to be taken out. 32 micro
trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I observed dirty
filters of micro trap machines, and water leakage at the south side vestibule. Supervisor was advised, and he
directed workers to pick up the excess water and replace filters.
I used B stainwell to proceed to the 2"” floor.
2"'' Floor - 42 workers were found inside the work place, demolishing the drop ceiling, spraying with amended
water around the area, picking up debris and placing into the boxes, demolishing: the partition at the north/west
side of the area, stairs between 2”^ and 1®' floor; cutting metal from the ceiling, cutting air ducts and pipes inside
the mezzanine between 2"" and 1®' floor; electricians cutting conduit inside the electrical room. Others cutting
metal into the pieces, using power tool with HEPA vacuum attached, spraying the area with amended water,
wrapping beams with poly, preparing boxes. 15 Gaylord boxes were on the floor sealed, sprayed and ready for
load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap
machines and tents.
I used B stairwell to proceed to the 1®’floor.
1®' Floor - 40 workers were present, demolishing sheetrock wall at the north/easf side, taking down air ducts
at the mezzanine, clearing shafts from debris, placing into the boxes, demolishing the drop ceiling to cut and
remove the air duct and conduit. Other workers cutting metal and placing into the boxes, spraying the work
area with amended water, preparing, wrapping and loading out boxes through the waste decon. A large amount
of debris and poly wrapped beams exists on the floor. 18 sealed Gaylord boxes were ready for load out.
Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the S’^floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor. Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D schoolI E hospital E public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4-Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131215
NYC-WTC_000182042