Asbestos inspection log, 130 Liberty Street, Feb 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on February 19, 2009, by TRC Environmental Corp.

NYC-WTC_000182042
Page image
Scanned page image, NYC-WTC_000182042
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date. 130 Liberty Street 02/19/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 ■ 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze_____ F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:00 pm to 2:15 pm

I arrived at the premise at 1:00 pm, proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 4“’loor. One worker was present for the decon maintenance, organizing the clean room. Negative air pressure was 0.035. 4"’ Floor - 26 workers were on the floor, filling up the pipes with foam, covering holes on the floor, re-sealing critical barriers, cleaning the top of tents, wrapping cables, sweeping and vacuuming the floor with equipment equipped with HEPA filter, clearing off the floor. Inspection was done on micro trap machines and tents. I observed that two micro trap machines were powered off. Handler Supervisor was advised to call the electricians for immediate inspection. After following the decontamination procedure I signed the log book and used south hoist to proceed to the 3'“ floor decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. One person was present for the decon maintenance. 3"* Floor - 45 workers were working on the floor. Platinum Electricians were in the process of cutting pipes and removing the electrical cables. Carpenters putting platforms across shaft; re-sealing critical barriers, demolishing the wall; removing metals from the ceiling using scissor lift, cutting metal with the tools attached to the HEPA vacuum, wrapping beams with poly. Others were loading out boxes and poly wrapped beams, picking up debris, preparing boxes. 12 sealed and sprayed Gaylord boxes were ready to be taken out. 32 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I observed dirty filters of micro trap machines, and water leakage at the south side vestibule. Supervisor was advised, and he directed workers to pick up the excess water and replace filters. I used B stainwell to proceed to the 2"” floor. 2"'' Floor - 42 workers were found inside the work place, demolishing the drop ceiling, spraying with amended water around the area, picking up debris and placing into the boxes, demolishing: the partition at the north/west side of the area, stairs between 2”^ and 1®' floor; cutting metal from the ceiling, cutting air ducts and pipes inside the mezzanine between 2"" and 1®' floor; electricians cutting conduit inside the electrical room. Others cutting metal into the pieces, using power tool with HEPA vacuum attached, spraying the area with amended water, wrapping beams with poly, preparing boxes. 15 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 1®’floor. 1®' Floor - 40 workers were present, demolishing sheetrock wall at the north/easf side, taking down air ducts at the mezzanine, clearing shafts from debris, placing into the boxes, demolishing the drop ceiling to cut and remove the air duct and conduit. Other workers cutting metal and placing into the boxes, spraying the work area with amended water, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 18 sealed Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the S’^floor. After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D schoolI E hospital E public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4-Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131215

NYC-WTC_000182042

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182042Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →