Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 3, 2009 by TRC Environmental Corp.

NYC-WTC_000182008
Page image
Scanned page image, NYC-WTC_000182008
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/03/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze_____ F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:35 am to 10:10 am

I arrived at the premise at 8:35 am. LVI schedule informed that activities include: demo in shafts, demo walls, clear off floor. Eagle temp platforms in shaft on S"" floor, demo walls, clear off floor, scrape Mezzanine fireproofing,. Eagle erect platforms various locations on 2"'* floor, clear floor, cut ducts, demo walls, ceilings on 1floor. Negative air manometer reading was 0.031. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3'‘’floor. Two workers were present for the decon maintenance, cleaning the shower chamber and organizing the clean room.

3'" Floor - 32 workers were present on the floor. Workers on scissor lifts were performing demolition of sheetrock wall between the two shafts, spraying with amended water, two others picking up debris and placing into the boxes. Workers on scissor lifts at the various locations of the work area were cutting metal fixtures from the ceiling. Carpenters working with plywood, preparing to erect the platforms around the shaft, I observed two workers plasticizing the hole at the south side critical barrier. A large amount of debris and poly wrapped beams were on the floor. 5 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I observed that one micro trap was not running and exhaust duct of the other machine was detached. I advised the Handler Supervisor, and he immediately directed workers to repair the damages. I used B stairwell to proceed to the 2™* floor.

2"“' Floor - 56 workers were found inside the work area, cutting metal fixtures from the ceiling at the various locations, plasticizing electrical room. Workers on mezzanine located between the 2"“ and V floors were scraping the fireproofing, spraying around the area and cleaning floor from debris. Others were cutting metal using tools attached to the HEPA vacuum, wrapping beams with poly, preparing boxes. 15 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the l” floor.

V' Floor - 81 workers on the floor were: demolishing brick wall and spraying with amended water; workers on , scissor lift were taking down hard concrete drop ceiling, removing black metal panels from the columns at the ; south side of the work area, clearing shafts, placing debris into the boxes and spraying with amended water, cutting metal at the various locations into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 12 Gaylord boxes were on the floor ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the 3’''floor.

After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough I “Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131153

NYC-WTC_000182008

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182008Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →