NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 05/01/09
Floor Zip Borough Block Lot Squad # Badge #
1’* Fl 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental Services Inc.
Address City Sample Number
462 Gerry Ave Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Third Party Air Monitor Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 (212)221-7822 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:55 pm to 10:00 pm
I entered the premise at 8:55 am. LVI schedule informed that activities include:
clear floor, cut ducts, demo walls, ceilings on 1®' floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area on Vfloor. Two workers were present for the decon
maintenance, organizing the clean room.
Negative air pressure was -0.026.
V Floor - 75 workers were found inside the V floor work area. Eagle scaffolding workers
at the north/west side extended area were erecting scaffolds, preparing the area
to cut the vertical beams and metal fixtures from the brick wall.
Workers on mezzanines of the west side area were clearing off floor, picking up debris,
placing into the boxes and spraying with amended water, preparing the area for air
duct removal.
Eagle scaffolding workers were at the north side shaft area erecting the scaffolds.
Workers were observed on scaffolds at the north vestibule removing insulation of the
airducts, spraying with amended water during removal.
Other workers were: cutting metal into the pieces at the south side, spraying the area
with amended water; preparing boxes, wrapping beams with poly, loading out sealed
and sprayed boxes through the north side waste decon.
Approximately 30 Gaylord boxes were ready for load out.
35 micro trap machines were powered on and 5 on stand by.
Inspection was done on micro trap tents.
After following the decontamination procedure I signed the log book and left the decon.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2____________________
NOV# Infraction Infraction Infraction Supervisor’s Initial^^^^,
Borough 1 “Manhattan 2-Bronx 3-Brooklyn 4=Queens 5=RicluTiond
BuildmgType A >6 stories B <6 stones C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=PubIic Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131070
NYC-WTC_000181965
OCR can misread numbers and units. Confirm readings against the page image before using them.