Change Order #44 submission, Ambassador Construction, Dec 1998

Machine-extracted title · confidence 100%

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

NYC-WTC_000171766–000171768

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Change Order #044 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000171766
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO.. INC. <«*

December 24, 1998

Mr. Walter Weems Silverstein Properties Inc. 7 World Trade Center New York, NY 10048

Re: Mayor’s Office of Emergency Management 7 World T rade Center Change Order #044 Amb. JoJi #557.5115

Dear Mr. Weems:

We are pleased to submit herewith our change order #044 to perform the following work at the above referenced premises for the sum of TWENTY FOUR THOUSAND THREE HUNDRED SEVEN DOLLARS ($24,307.00):

SCOPE OF WORK Furnish and install the fuel oil piping in accordance with Swanke Hayden Connell sketch dated 12/14/98 revise routing. The following are the costs: - Furnish and install 2 hour rated enclosure of lath with two (2) inches of plaster around pipes suspended box. $15,470.00 - Remove and replace sheetrock ceilings $2,500.00 - Paint ceiling $1,500.00 - Patch block £>X5OXLQO Subtotal $20,970.00 General Conditions 1,678.00 Overhead and Fee 1,359.00 Insurance ____ 3QflLQQ Total $24,307.00

We trust the above meets with your approval and we look forward to the continued pleasure of serving you.

Continued... 317 MADISON AVENUE, NEW YORK. NY 10017.212 922 1020, FAX 212 949 9762

NYC-WTC_000171766

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171766Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.968

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168566 · Box 7DCAS

Ambassador Construction submits Change Order #44 to install fuel oil piping and enclosures at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000168359 · Box 7DCAS

Contractor submission for Change Order #105 regarding audiovisual system expansion and library head end drawings.

Similar indexed content

NYC-WTC_000171855 · Box 7DCAS

Letter detailing Change Order #41 for revised antenna support details installed into beam webs at the Office of Emergency Management.