NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166915
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

P PS-Generators

Plug in, solid state time delays shall be provided for unloaded cooldown, adjustable from 0 to 15 minutes (factory set at 15 minutes). The cooldown time delay shall be adjustable from 1 to 3 minutes (factory set at 3 minutes) and automatically bypassed for malfunction and manual shutdown of the engine generator set. The failure to synchronize time delay shall be adjustable from 1 to 3 minutes (factory set at 3 minutes) and provide audible and visual indication but shall not terminate synchronizing attempts nor shut down the engine.

c. Engine Starting Control

The engine starting control logic shall be microprocessor based and shall automatically start, protect and monitor each engine generator set. Electro-Mechanical engine start controls are unacceptable. The engine starting control logic shall be capable of controlling engines furnished with the following:

1) Starting motor magnetic switch.

2) Electrically operated fuel control.

3) Normally open protective switches that close for abnormal conditions of pressure, temperature, speed and liquid level when required.

The engine starting control logic shall provide electrically isolated contacts for electronic governor control, electric fuel control, battery charger disconnect dining craning and common shutdown alarm annunciation. All relays shall be the same as interchangeable with, the relays specified in Generator Sensing Panel section.

1) Engine Start/Stop Operation

The automatic engine control logic shall initiate operation of the engine upon receipt of a signal from a contact which closes for engine run and opens for engine stop. Upon start of the engine, the engine control logic shall automatically disconnect the starting motor and prevent its reconnection until the engine has come to a complete rest.

OEM PPS-40 Generators 7 WTC March 20, 1998

NYC-WTC_000166915

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166915Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →