ATS Nuisance Startup Report, 7 World Trade Center, Sept 1999

Machine-extracted title · confidence 95%

Report detailing the investigation into an automatic transfer switch nuisance engine start at 7 World Trade Center on September 23, 1999.

NYC-WTC_000172978–000172980

Folder label: “Improper Engine Startup on 9/23/99

Page image
Scanned page image, NYC-WTC_000172980
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICES FACILITIES MANAGEMENT AND CONSTRUCTION

MUNICIPAL BUILDING, IG"- Floor New York, NY 10007 ( 212)669-2670 Fax (212) 669-2780

WILLIAM J. DIAMOND JOSEPH WAGNER, P.E. Commissioner Deputy Commissioner / Chief Engineer

Raymond M. Lynch September 30, 1999 Mayor’s Office of Emergency Management 7 World Trade Center New York, N.Y. 10048

Re: Improper Engine Startup on 9/23/99

Dear Ray, As per your direction, to follow please find a concise report (Job#24536) submitted by Jody Foley (Russelectric Engineer) to address the above captioned nuisance.

Each ATS was checked for historical data to determine if an ATS transferred or saw a power outage on 9/23/99, however none was logged. At this time Jody Foley feels ATS 1, located in the generator room, was the cause of the nuisance engine start due to two factors. One being ATS 1 ’s time delay setting (TD 1) had a time delay of 0 seconds. Secondly, an accessory sensor to sense under/over voltage and under/over frequency was installed. Therefore if there was a slight power glitch, interruption, spike, whatever...ATS 1 would have sensed it and start engines.

Jody, has now changed the TD 1 to 3 seconds and removed the accessory sensor that caused nuisance startup. To identify future system problems he has installed traps (PLC logic) in the switchgear to identify the respective ATS causing the problem.

I have fiirther requested that the Panelware processor be able to relay this necessary information so that an Engineer does not have to inconvenience the building personnel for access to each ATS to download historical data rather than downloading it from the Panelware in the generator room. Jody agreed, however he did not have the software with him. We are scheduling for next week and I will notify you of such date and time.

Please note, we need to get a telephone line installed in the OEM generator room so the Field Service Engineers can download software to their laptops or even contact the office for further technical support.

If you need additional information pertaining to this report or my visit yesterday at OEM please do not hesitate to call me at 212-669-4044.

Sincerely,

Greg Garofolo Sr. Stationary Engineer

cc: J, Wagner D/C, E. Theofan A/C, T. Papsodero- Director, G. Pymento- DRES >

NYC-WTC_000172980

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172980Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.873

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →