Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000165824–000165828
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
(2) Re: North Access Connection 10th Avenue Tunnel, Amtrak Borough of Manhattan Gentlemen: On September 23, 1983 30% progress plans for the subject project were transmitted to your agency for review and comment. The comments of the various affected agencies that were recieved either by letter or at the meeting held by this office on October 11, 1983, have been addressed by the consultant for ANTRAK and the MTA/LIRR in the preparation of the 95% progress plans for the project. As you will note, the proposed AMTRAK crossing of 10th Avenue, is a fairly deep cut-and-cover tunnel which is substantially beneath your facilities. A meeting has been scheduled to receive your comments as noted: Time: 10:00 Date: December 19, 1983 Place: 51 Chambers Street Room 412 Transmitted herewith are sets of 95% complete plans for the subject construction project, sent to you for comments in the area of your purview. It is requested that you or your representative present your comments on this matter, at this meeting. It you feel that your agency's facilities are not affected and that your representation is not necessary, I would appreciate receiving your written approval prior to the meeting date. Your expeditions review of this project will be appreciate.
Very truly yours,
HARR^^^xMAMIS, P . E . Director Mass Transit Coordination Enclosure Please Note: Three (3) additional sets have been transmitted to your agency. under separate cover, by the consultant.
NYC-WTC_000165826
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165829
Cover letter from the Department of Transportation Bureau of Planning and Research transmittal documents to various city agencies.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165851
Cover letter from the Department of Transportation transmittal documents to the DEP Bureau of Sewers and other agencies.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165786
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165343
DEP Bureau of Sewers approves tunnel plans with no additional hydraulic objections and minor drafting corrections noted.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 51 Chambers Street · 3 pages · confidence 0.00 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder