Machine-extracted title · confidence 95%Letter from engineers enclosing minutes of an October 11, 1983 meeting between NYC DOT and MTC.
NYC-WTC_000165849–000165850Folder label: “North Access Connection, AMTRAK 10th Ave. Tunnel”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SEEIYE STEVENS^ V^UE & KNECIST.
AMTRAK NORTH ACCESS CONNECTION TENTH AVENUE TUNNEL SSV&K JOB NO.: 22-6018
MINUTES: October 11, 1983
Time: 10:00 A.M. Place: M.T.C.C.C. 51 Chamber Street New York, NY 10013 Purpose: 30% Design Review Attendance: R. Lawrie - N.Y.C.D.O.T., M.T.C.C.C. H. Kamamis - N.Y.C.D.O.T., M.T.C.C.C. /R. Aggarawaf - N.Y.C.D.E.P., Sewers R. Sturm - LIRR J. Brusko - SSV&K D. Yue - SSV&K Discussion: 1. Bureau of Sewers requested calculation of flow in proposed 30" DIA. R.C.P. if its capacity is less than the existing 4'-0" x 2'-8" sewer. 2. Manhole No. 1 will be a N.Y.C.D.E.P. Bureau of Sewers type A-1 or A-2 manhole as required by its depth. 3. SSV&K introduced a plan for reconnection of 6" DIA. and 24" DIA. force mains from a sump in Penn Station. These pipes are believed presently to connect i to that portion of the 4'-0" x 2'-8" existing sewer to be replaced under this contract. SSV&K will attempt to verify the existence and location of this * connection. 4. SSV&K will add notes received from N.Y.C.D.E.P. Bureau of Sewers to these drawings and will make other minor changes indicated by that agency. 5. Bureau of Sewers will forward additional notes to SSVK concerning potential conflicts between house connections to sewers and existing water mains. 6. M.T.C.C.C. will obtain comments from City agencies not in attendance at this meeting, specifically bridge and water supply agencies. It was suggested that SSV&K similarly obtain comments from the private utilities.
NYC-WTC_000165850
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165797
Letter from STV&K submitting revised utility and project drawings and sewer chamber computations to DEP, incorporating earlier department comments.
5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165795
Letter from STV&K submitting revised drawings for utility work and structural computations for sewer chamber to DEP for review and approval.
5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165840
Letter from engineers submitting revised plan sets in response to previous department comments on the tunnel project.
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165794
Letter from STV&K submitting omitted structural computations for a sewer chamber to the Department of Environmental Protection.
5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 51 CHAMBER STREET · 1 pages · confidence 0.00 · verify page 2
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder