NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146428
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document ASBESTOS INSPECTION REPORT (continued) 26. Asbestos Hauler IESI _ NYS DEC Permit # NJ452 Disposal Ste(e) Biueridge Landill PA 27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings) •)ODemollton b) OBoller Replacement c) Sprinkler Replacement d) D Renovation/Atteration •) fireproofing Replacement 1n El Other (Describe) Asbestos Abatement 2.D ROMONAIATEMEM Endiod al aproprial Erncapeulation • Removal • Clean up 29. ABATEMENT PROCEDURE (Check all appropriate boxes) • Full Containment • Glovebag • Tent • DEP Variance Application 30. LOCATIONS OF ABATEMENT Floor(s) DESCRIBE SECTION OF FLOOR (o.g. entire, esst wing, room &, boller room, lobty, ete) roof set back roof 1-4fl fire escape 1-4 fl window main root entire 1-4 fl entire 1 fl lelevator AFFECTED SURFACES CONTAINING ACM (e.g. Ptpe iagging, oeting, plenum ducts, storage tanks, decking, etc. roof fire escape window sash roof stairways top of elevator AMOUNT OFACM SQUARE FEET LINEAR FEET 400 100 100 1,500 350 40 1re 0257MN02 DESCRIPTION OF WORK BEING PERFORMED (e.g. running cable, installing fire sprinklers removing and replacing bollers, etc.) clean up clean up clean up clean up clean up clean up 31. I hereby declare that theinformation provided herein is true and complete to the best of my knowiedge. I am familiar with Federal, State and N°C laws and regulations applicable to asbestos related work. Brasbestos Envird rmental Svcs Cashei, inc Prtnt Name of Michael O'Connor Prisd ppticant (tf ofher than Oamer 3/4/02 3/4/02 3/4/02 32. I understand that as the owner of a building where asbestos abatement activity occurs, 1 am responsible for the performance of he asbestos abatement activities in accordance with the Asbestos Contrö, Pepgram Rules. I have contracted the third party ai monitor who is completely independent of all parties involved in the asbestos project. I hereby declare that I have authorized the filing of this notification for the work specified herein.! Promegranate Property inc. 3/4/02 Prind Name of Owner Signature Dete A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BÉ AVAILABLE AT THE WORK SITE Any modification of information provided on this form must be reported immediately in writing directly to the NYC DEP ACP. The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened through the performance of work in incremental or piecemeal fashion. ACP7 2/2001 NYC-WTC_000146428

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146428Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →