NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146370
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Emer# 3178218 P ORIYC TYPEWRITTEN -Ctl # NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION DDEP Asbestos Control Program 59-17 Junction Boulevard, 8" Floor, Corona, NY 11368-5107 ASBESTOS PROJECT NOTIFICATION ER 160/0 EMENERRUY When submitting this form at the NYC Deplartment of Bulldings, the original form and three (3) copies with original signetures are requlred. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYCSDEP not less than one week in advance of the start of abatement activities. TRH 1370M201 Building Dept. oxrRU No FOR OFFICIAL USE ONLY ,800 ee fee scheu 1. FACILITY 2. Address 123 Washington Street AKA 4 Albany Street Borough Manhattan _ 3.Block 53 _ Zip_10006 4. Lot_23 5. Type of Facility Corporate Operating Facility _ 6. Name of Building II. BUILDING OWNER 7. Name Bankers Trust Company 8. Contact Person Marino Prodan 9. Tel.# Fax# 10. Address 14 Wall Street - City NY State NY_ Zip 10005 III. GENERAL CONTRACTOR 11. Name_ Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name PAL 14. Federal Employer ID. # 15. Tel. 13. Contact Person Paul Mast Fax# 16. Address. 43-09 Vernon Blvd City LIC State NY _ Zip_11101 V. THIRD PARTY AIR MONITOR 17. Name Ambient Labs 19. Federal Employer ID. 20. Tel. # 21. Address 55 w 39th Street City NY 22. Sample Analysis Laboratory ambient 18. Contact Person John Leitner Fax # State NY Zip_ 10018 23. NYS DOH ELAP # 10865 VI. PROJECT INFORMATION 24. Starting date for this portion of work _11/12/01 Projected completion date 12/30/01 Asbestos work schedule E Monday ElTuesday El Wednesday Thursday EFriday M Saturday Sunday Shift from: 8:00 Dam pm to 12:00 am • pm If other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. RECEIVED NOV 1 6 2001 25. Total amount of asbestos-containing material to be abated during this work 700Square Feet, and/or OLinear Feet ACP 7 2/2001 NYC-WTC_000146370

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146370Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →