NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ocr · source: ours
NYC 9/11 Public Portal Document YBR DEPT OF FRASE RECEIVER PEWRITTEN DRMS WIL CITY CÁP0 262082 YC DEPARTMENT OF ENVIRONMIENTAL PROTECTION Asbestos Control Program -17 Junction Boulevard, 8ª Floor, Corona, NY 113685 <S0t 0595 MNO (ASBESTOS INSPECTION REPORT) 4206. ee fee schedule ae submitted to the NYC DEP not less than one week in advance of the start of abatement activities. 2. Address_ 150 Franklin Street AKA N/A Borough Manhattan 3. Block_189 Zip_ 10013 _4. Lot 7 5. Type of Facility Apartments 6. Name of Building N/A II. BUILDING OWNER 7. Name 150 Franklin Owners Corp. 8. Contact Person_ Emily Sorkin 9. Tel. Fax 10. Adress 150 Franklin Street City New York State NY _Zip 10013 IIL GENERAL CONTRACTOR 11. Name N/A _ Tel.# IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name D.S.A Services, Inc. 14. Federal Employer ID. _ 15. Tel. 13. Contact Person Anthony Frassetti Fax # 16. Address_P.O. Box 60547 City Staten Island State_NY _ Zip 10306 ....V. THIRD PARTY AIR MONITOR 17. Name Donohoe Environmental, Inc. 19. Federal Employer ID 20. Tel. 18. Contact Person Tim Donohoe Fax 21. Address 39 Bowery #685 _City New York 22. Sample Analysis Laboratory Scientific Labs State NY 23. NYS DOH ELAP # 11480 _Zip_10002 VI. PROJECT INFORMATION: . 24. Starting date for this portion of work_4/18/02 Projected completion date 4/20/02 Asbestos work schedule E Monday E Tuesday IZlWednesday [Zl Thursdayl Friday E Saturday [ Sunday - _E am Dpm to 4 _0am 2 pm Shift from: 8 If other, specify RECEIVED Access ta inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 8,500 Square Feet, and/or _ • Linear Feet APR 2002 TECHNICAL REVIEW UNIT ENVIRONMEN A TRU 1 ACP 7 2/2001 NYC-WTC_000146407
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122774
An invoice from Fiber Control Inc. dated August 2002 for facade services performed at 179 Broadway.
11 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000099015
Permit application submitted to DEP for asbestos inspection and cleanup work at a WTC vicinity building in July 2002.
Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134033
Form notifying DEP of an asbestos inspection project at a specific location.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111453
NYC DEP Asbestos Project Notification form for an inspection report submission.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128041
Application for roof work at 143 Fulton Street submitted by Benjamin Kurzban & Son Control Inc.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122659
Invoice for roof asbestos abatement work completed at 176 Broadway covering over 77,000 square feet.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111346
NYC DEP Asbestos Project Notification form for facility at Nassau Street.
Similarity score 0.973 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000153382
Document arguing that respirator safety issues fall under OSHA jurisdiction and should be removed from the EPA review.
Cited alongside this record in an Ask answer
NYC-WTC_000138846
OSHA transmits NYS DOL data report containing sample summaries and worker information for WTC.
Cited alongside this record in an Ask answer