NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146394
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document oe canoe, NYC be seruent OF ENVIRONMENTAL PROTECTION | ea ae Asbestos Control Program f, O9GO VL u 89-17 Junction Boulevard, 8” Floor, Corona, NY 11368-5107 ~ G § \ eee ASBESTOS PROJECT NOTIFICATION r (ASBESTOS INSPECTION REPORT) 1. $4 = eS, fee schedule) When subm at the NYC Department of Buildings, the original form and three (3) copies with original - Subpiittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the¥9¥C DEP not less than one week in advance of the start of abatement activities . Wy - Mees. () Address 114 Liberty Street Borough SYOrE— Zip _ 10006 A AKA 3.Block 52 4 tot TT ¢ 5. Type of Facility Residential 6. Name of Building Il, BUILDING OWNER 7. Name 114 Liberty Condominium 8. Contact Person Ms. Denise Sweeny 0. To A Foxe 10. Address 114 Liberty Street City New York state NY zip 10006 Ill. GENERAL CONTRACTOR 11. Name. Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name Lacen Contracting Corp. 43. Contact Person _Caflos R. Lacen 44. Federal Employer a 45. Tel. lil Fax 16. Address 30-51 14th Street City Astoria state NY zip _11102 ¥. Tilind Zand’ AiR MONITOR 17. Name Environmental Consulting &Management 18. Contact Person Mr. Mark Rutstein 19, Federal Employer QD, - 21. Address _10 Filmont Drive City New City State NY Zip 22. Sample Analysis Laboratory, EMSL 23. NYS DOH ELAP # 11506 VI. PROJECT INFORMATION 24. Starting date for this portion of work _7/ ‘1202 Projected completion date 7/1 2/02 Asbestos work schedule CJ Monday [1] Tuesday CJ wednesday C1) Thursday [1 Friday C1) saturday) sunday Shift from: 8:00 Mam 1 pm to 5:00 Olam W] pm if other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 100 square Feet, andor____——=——©_ Linear Feet NYC-WTC_000146394

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146394Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →