WTC Debris Clean-up Permit Application, Jun 2002

Machine-extracted title · confidence 95%

Application form submitted for debris clean-up activities on building exteriors following the World Trade Center collapse.

NYC-WTC_000093680–000093688

Folder label: “LANDMARK INFORMATION

Page image
Scanned page image, NYC-WTC_000093687
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program 59-17 Junction Boulevard, 8th Floor, Corona, NY 11368-5107 W.o ` I Building Dept. TRU No ov FOR OFFICIAL USE ol&Y ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1 fee

When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities .

I. FACILITY

2. Address 90 Maiden Lane _ Borough Manhattan Zip 10005 AKA 3. Block 42 4. Lot 36

5. Type of Facility_ 6. Name of Building II. BUILDING OWNER

7. Name AM Property Holding Co. 8. Contact Person 9. Tel. # Fax #

10. Address City State Zip Ill. GENERAL CONTRACTOR

11 Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Trio Asbestos Removal Corp. 13. Contact Person Chris Horan

14. Federal Employer ID. #._._._._._._._._.P _._._._._._._._.; 15. Tel. # 718-961-4100 Fax # 718-961-4103 16.Addressl4_20 1 29th Street City College Point State_NY Zip11356

V. THIRD PARTY AIR MONITOR Warren & Panzer Engineers, P.C. Michael Nolan 17. Name 18. Contact Person • 19. Federal Employer ID. # 20. Tel. # 212-922-0077 Fax #212-922-0630 21.Address 228 East 45th Street City New York State NY Zip10017

22. Sample Analysis Laboratory Warren & Panzer Engineers 23. NYS DOH FLAP # 11251

VI. PROJECT INFORMATION

24. Starting date for this portion of work L Z Projected completion date 7 3 c% L

Asbestos work schedule v1onday I(1,Tuesday ' Wednesday 3 Thursday I Friday C6aturday ® Sunday Shift from: " __Oam ❑pm to Dam Vpm

If other, / // RFl`~71RD

Access to inspect the premises must be provided during the work schedule indicated in this item. Ui~ .- J O 2 5 20 25. Total amount of asbestos-containing material to be abated during this work f~NVH ~ .5~~6 BEAD M 1 0, 600 Square Feet, and/or Linear Feet 6 !~ Ot ACP 7

NYC-WTC 000093687

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000093687Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →