NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 01/LANDMARK INFORMATION
Document / 9 pages

WTC Debris Clean-up Permit Application, Jun 2002

Machine-extracted title · confidence 95%

Application form submitted for debris clean-up activities on building exteriors following the World Trade Center collapse.

NYC-WTC_000093680–000093688

Folder label: “LANDMARK INFORMATION

Page image
Scanned page image, NYC-WTC_000093685
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

u1Y NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program 59-17 Junction Boulevard, 8th Floor, Corona, NY 11368-5107 V f~ V Building Dept. orffRJNo FOR OFFICIAL USE ONLY A... -- ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) (fee fee schedule)

Buildings, the original form and three (3) copies with original •equires one copy of the form with original signatures. This one week in advance of the start of abatement activities.

I. FACILITY

2. Address 63 Wall Street Manhattan Zip 1 0005 Borough AKA 27 3. Block 4. Lot 9 5. Type of Facility _ 6. Name of Building II. BUILDING OWNER

7. Name Brown Brothers Harriman 8. Contact Person

9. Tel.# 212-493-8616 Fax# 10. Address _ City State Zip Ill. GENERAL CONTRACTOR

11. Na Tel.# IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name Trio Asbestos .Removal Corp, Chris - Horan i3. Contact Person

14. Federal Employer ID. # P11 .-.-.-.-.-.-.-.-.-.-.-.-.-.-. 718-961-4100 718-961-4103 15. Tel. # Fax # 14-20 129th Street College Point . NY 11356 16. Address _ City____________________ State Zip V. THIRD PARTY AIR MONITOR Warren & Panzer Engineers, P.C. Michael Nolan 17. Name 18. Contact Person 19. Federal Employer ID. # 20. Tel. # 212922_0077 Fax # 212-922-0630 21.Address228 East 45th Street airy New York Zip10017 State NY Warren & Panzer Engineers 22. Sample Analysis Laboratory 23. NYS DOH ELAP # 1 1 251 VI. PROJECT INFORMATION

24. Starting date for this portion of work & 2.1 O t Projected completion date

Asbestos work schedule 0 Monday ❑ Tuesday ❑ Wednesday ❑ Thursday ❑ Friday 0 Saturday ❑ Sunday

Shift from: ?[Am ❑pm to O ❑a~pm i 1

If other, specify

Access to inspect the premises must be provided during the work schedule indicated in this item.

25. Total amount of asbestos-containing material to be abated during this work

5,000 Square Feet. and/or Linear Feet

NYC-WTC000093685

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000093685Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →